Section 6 · Physical mechanism

Section 6 — Crowd Movement and the Physical Mechanism of the Disaster

Hillsborough is particularly important for crowd-management education because the disaster demonstrates how failures occurring at different stages of the spectator journey can interact. It was not produced by one exceptionally dense crowd suddenly appearing in one location. A sequence developed in which arrival demand exceeded processing capacity; people accumulated outside the stadium; an emergency intervention changed the rate of admission dramatically; the resulting flow was not redistributed internally; spectators were channelled towards already-full compartments; lateral redistribution was restricted; escape capacity was inadequate; and crowd forces became sufficient to cause loss of individual movement, severe compression and structural failure. The later Operation Resolve investigation describes these elements as interconnected rather than independent failures.

A fundamental lesson is therefore that crowd safety cannot be assessed solely by asking whether the whole venue is below capacity. Capacity, distribution, route choice, flow rate, local density and the ability to reduce or stop an inflow must all be considered at the level of the particular space through which people are moving.

Section 6 · Crowd movement and mechanism

Flow system and external accumulation

6.1 The crowd system should be understood as a chain

The Leppings Lane operation can be considered as a connected flow system:

Arrival area → external approach → turnstiles → inner concourse → route selection → central tunnel or side routes → individual terrace pens → barriers/perimeter → emergency escape.

Each stage possessed a finite ability to receive, process, hold or discharge people. Problems developed because the capacities of these stages were not matched.

Modern SGSA guidance uses essentially this systems approach when safe capacity is calculated: entry, holding, exit and emergency-exit capacities are separately assessed, and the final safe capacity is governed by the lowest applicable figure. That modern guidance should not be retrospectively imposed upon the 1989 operation, but it illustrates precisely why examining only the nominal overall attendance is inadequate.

https://sgsa.org.uk/physical-factors/calculating-safe-capacity/

External accumulation

6.2 Demand exceeded the service capability of the Leppings Lane entrance

The first physical mechanism was comparatively simple: spectators arrived at the entrance faster than they could be processed.

Seven turnstiles, A–G, were serving the 10,100 standing places allocated to the West and North-West terraces. HSE's post-disaster analysis therefore calculated an average requirement of 1,443 spectators for each of those seven turnstiles, substantially greater than the admission requirement at other areas of the stadium. The HSE described the West Terrace turnstiles as having the highest average admission requirement of any zone at Hillsborough.

Between approximately 2.05 pm and 2.50 pm, HSE measured the actual mean admission rate at about 660 persons per turnstile per hour. At 2.50 pm it estimated that approximately 6,115 spectators had entered through A–G, leaving 3,985 of the nominal 10,100 terrace allocation still to enter. At the measured rate, admission of 10,100 solely through those turnstiles would not have been completed until approximately 3.40 pm.

This is one of the clearest quantitative findings in the Hillsborough record.

It means that by the late pre-match period, the difficulty outside Leppings Lane was not merely the consequence of spectators choosing to arrive close to kick-off. There was a substantial mismatch between remaining demand and available processing capability.

Reference — HSE, An Investigation into the Number of People Entering the Stadium Through Turnstiles A to G and Through Gate C, IR/L/ME/89/34

This 1990 HSE technical report analysed CCTV recordings to determine turnstile throughput and Gate C admissions. It is one of the most important quantitative documents for understanding the ingress mechanism.

https://www.hse.gov.uk/foi/releases/hillsborough/me8934.pdf

6.3 Crowd accumulation then reduced processing efficiency further

Once arrival rate exceeded the ability of the turnstiles to process spectators, the number waiting outside increased. This was not simply a static queue.

HSE found that admission rates began falling at about 2.35 pm. Its technical assessment considered a likely explanation to be crowd forces acting upon people attempting to enter the turnstiles. The same report noted that a turnstile operator could experience difficulty releasing some turnstiles when sufficient horizontal force was being exerted against the rotating mechanism.

This produced an important feedback mechanism:

insufficient processing → external accumulation → increasing density and pressure → greater difficulty using the turnstiles → reduced processing efficiency → further accumulation.

For crowd managers, this is a critical concept. A processing system cannot always be assumed to continue delivering its theoretical throughput as the queue becomes denser. Once the crowd begins physically loading the processing point, the service rate itself may deteriorate.

Supporters described being unable to turn around or retreat, while mounted police officers reported horses being affected by the force of the crowd. Turnstile operators described supporters reaching them distressed and unable in some cases even to retrieve tickets from their pockets.

Reference — HSE, An Investigation of the Turnstiles at the Leppings Lane Entrance to the Stadium, IR/L/ME/89/33

This technical investigation examined the physical operation of the turnstiles, their computerised counting system and the admission requirements placed upon different entrance banks. It provides particularly useful evidence regarding how external force could affect turnstile operation.

https://www.hse.gov.uk/foi/releases/hillsborough/me8933.pdf

Section 6 · Crowd movement and mechanism

Compression, Gate C and route choice

From queue to crowd-compression emergency

6.4 The external crowd ceased to function as an ordinary queue

By approximately 2.20 pm, witnesses were describing a mass of people rather than distinguishable queues. Those near the turnstiles were unable to retreat against the pressure developing from behind. By the period between 2.30 and 2.48 pm, accounts describe people struggling to breathe, screaming in pain and being compressed against walls and turnstiles.

This distinction matters operationally.

A queue is still largely capable of self-regulation: individuals retain space, can usually alter their position and can normally respond to instructions. A very dense crowd accumulation behaves differently. Individual movement becomes progressively constrained by surrounding bodies, and the ability of individuals to correct the situation by simply “moving back” diminishes.

The external condition at Leppings Lane had therefore become an emergency before Gate C was opened.

Reference — IOPC/Operation Resolve, 2.30pm–2.48pm: The Crush Intensified

This section of the 2025 investigation brings together supporter, police and CCTV evidence describing how the external congestion developed into a severe crowd-compression emergency.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/crush-intensified

Gate C and the sudden change in system capacity

6.5 Gate C solved one capacity problem while creating another

The opening of Gate C should not be described in isolation as an inexplicable decision to admit additional spectators.

The immediate purpose was to decompress the dangerous crowd outside.

The problem was that opening a gate approximately 4.1 metres wide transformed the rate at which spectators could enter. HSE's video analysis estimated approximately 150 people entered during the first short opening. During the principal second opening, its best estimate was approximately 2,000, with around 1,800 directly counted and an upper estimate of approximately 2,200. A further approximately 90 entered during the third opening. HSE's best overall estimate was therefore 2,240 admissions through Gate C.

At the beginning of the main opening, HSE measured a brief flow of approximately 10 persons per second, settling to approximately six persons per second during much of the remaining flow.

The scale change is striking.

Seven turnstiles had been admitting approximately:

660 × 7 = about 4,620 persons per hour, or approximately 1.28 persons per second collectively on average.

Gate C alone was temporarily allowing flow at several times that combined rate.

That does not mean Gate C itself was the sole cause of the disaster. It means that the operating characteristics of the entire ingress system changed within seconds.

The downstream system needed to change with it.

It did not.

6.6 High inflow is only safe when downstream capacity exists

This is perhaps the single most transferable crowd-management lesson from Hillsborough.

Opening a large gate can relieve pressure upstream. But the people released through that gate must have somewhere safe to go.

At Gate A, police established an internal cordon and actively directed incoming spectators towards their intended accommodation. At Gate C, there was no equivalent downstream control system. Operation Resolve found that officers inside had not been prepared for the large inflow and no plan existed for controlling distribution after entry.

Consequently, an action that relieved the external compression transferred demand very rapidly into the internal circulation system.

For crowd-management purposes, emergency ingress should therefore never be considered only at the gate itself. The assessment has to continue downstream:

Where will the people go? What is the holding capacity there? What route will they naturally choose? Can that route be closed? Where can excess demand be redirected?

Route choice

6.7 The central tunnel was the dominant route

After entering Gate C, spectators reached the concourse beneath the West Stand.

The central tunnel was the most obvious onward route. It led directly towards pens 3 and 4. Routes towards the side pens were positioned at either end of the stand and were less immediately visible. Operation Resolve specifically found that the central pens were accessed through the tunnel whereas routes to side pens were not immediately visible or clearly signposted on entry.

The important point is that spectators entering through Gate C did not need to behave irrationally for concentration in the centre to occur.

They simply needed to follow the most obvious available route to the standing accommodation.

The failure was therefore partly one of environmental guidance and route design.

Reference — IOPC/Operation Resolve, The Situation in the Pens

This source reconstructs the relative occupation of the individual pens and explains how the tunnel and side routes were configured. It also examines responsibility for monitoring the terrace.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/situation-pens

6.8 “Find your own level” depended upon movement that the physical layout discouraged

The police approach permitted West Terrace spectators, at least theoretically, to distribute themselves across the available pens.

That concept assumed that spectators would recognise when one area was becoming crowded and voluntarily move elsewhere.

The physical environment worked against that assumption.

The centre was reached by the direct tunnel. Movement from one pen to another was restricted by radial fencing, with only narrow openings towards the tops of the pens. Operation Resolve records evidence that although movement between pens was theoretically possible, it was difficult in practice.

This provides a particularly important distinction between choice in theory and choice in practice.

When crowd distribution is safety-critical, it should not be assumed that a large incoming population will distribute itself evenly merely because alternative spaces technically exist.

Visibility, signage, desire lines, distance, physical barriers, personnel direction and the ability to reverse direction all influence distribution.

Section 6 · Crowd movement and mechanism

Local capacity and pen capacity

Local capacity rather than overall capacity

6.9 The West Terrace was not one homogeneous crowd space

One of the most serious conceptual errors would be to regard the West Terrace simply as an area holding 7,200 spectators.

By 1989 it had been divided by radial fencing into separate pens.

Those fences meant that each pen had become, in crowd-flow terms, an individual holding compartment. Capacity therefore needed to be understood at individual-pen level rather than only for the terrace as a whole.

The additional fencing installed in 1985 created pens 3 and 4 and the narrow pen 5 corridor. Engineering expert John Cutlack later concluded that capacities should have been recalculated when the physical subdivisions were introduced. They were not.

Reference — IOPC/Operation Resolve, The Installation of Additional Fences in 1985

This source explains how the final pen configuration developed and why the subdivision should have prompted new capacity calculations.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/installation-additional-fences-1985

Pen capacity

6.10 Contemporary HSE analysis found the central-pen capacities were substantially overstated

A Sheffield Wednesday/Eastwood & Partners drawing showed the capacities of the two central pens as 1,200 and 1,000, producing a combined figure of 2,200.

HSE initially calculated that, simply applying the 1986 Green Guide's maximum packing allowance of 5.4 persons/m² to the gross standing areas, the two pens would hold about 2,051 people.

However, this calculation did not sufficiently account for the relationship between people and the crush barriers.

A more detailed HSE assessment divided the terraces according to the areas that could properly be protected by the available barriers. It calculated maximum figures of 822 for Pen 3 and 871 for Pen 4 — 1,693 combined.

Even that 1,693 figure was not considered the final safe answer.

HSE expressly stated that further reductions might be necessary because of six additional departures from Green Guide recommendations, including terrace-step dimensions, distance to exits, barrier heights, alignment and width of barrier gaps, and the width of the gates in the perimeter fence.

This provides a crucial crowd-management lesson:

density × area is not, by itself, a safe-capacity calculation.

The physical condition of the space, barriers, escape provision, geometry and quality of management must also constrain capacity.

Reference — HSE, An Estimation of the Maximum Allowable Capacities of Pens 3 and 4, IR/L/ME/89/35

This report is one of the most valuable technical documents in the Hillsborough archive. It reconstructed the central-pen capacities using the 1986 Green Guide and concluded that the combined maximum should not exceed 1,693 even before additional reductions for other deficiencies were considered.

https://www.hse.gov.uk/foi/releases/hillsborough/me8935.pdf

6.11 A density figure is not automatically a danger threshold

The HSE's calculations used 5.4 persons/m² because this was the upper packing allowance contained within the applicable 1986 Green Guide where terrace and barrier conditions met the necessary criteria.

It would be incorrect to turn that figure into a universal statement that “5.4 people per square metre is safe”.

The permitted density depended upon the physical conditions assumed by the guidance. HSE's later analysis specifically reduced the nominal pen capacity because the barrier configuration did not provide appropriate protection across the whole terrace. Additional non-conformities then suggested that an even lower capacity should have been used.

This is an important distinction for anyone studying crowd density.

Density should be treated as one variable within a risk system, not as a stand-alone pass/fail number.

Section 6 · Crowd movement and mechanism

Already-loaded pens, tunnel control and geometry

Pens 3 and 4 were already full before the major inflow

6.12 The fatal sequence began with an already-loaded destination

Operation Resolve concluded that by approximately 2.40 pm, pens 3 and 4 were full or very close to full. By contrast, significant capacity remained within the side pens.

The visual disparity had been apparent earlier. As early as approximately 2.15 pm, the centre pens were noticeably fuller than the surrounding sections.

This is critical.

The large Gate C inflow was not entering an empty distribution area that gradually became too crowded. It was entering a system in which the most obvious downstream destination was already at or approaching capacity.

The correct control therefore needed to exist upstream of the pens, before additional spectators entered the tunnel.

The tunnel as the critical upstream control point

6.13 Closure of the central tunnel could have isolated the full pens from the inflow

The 2016 inquest jury found that commanding officers should have ordered the closure of the central tunnel before Gate C was opened because pens 3 and 4 were already full.

This finding is particularly important for crowd-management education.

Where a holding area is full, action is often more effective upstream than at the point of overcrowding itself.

Trying to redistribute people once they have entered an overfilled pen is much more difficult than stopping additional flow before they enter.

The central tunnel therefore represented a critical control point:

open tunnel = continued demand into pens 3 and 4

closed tunnel + active diversion = demand transferred towards alternative available space

Evidence examined by Operation Resolve showed that tunnel closure had previously been used at other matches, including evidence of its use during the 1988 semi-final. Yet no trigger or formal responsibility for applying that control appeared in the 1989 Operational Order.

Geometry of the tunnel

6.14 The tunnel did not merely provide access—it channelled movement

The central tunnel descended towards the terrace. The 2025 investigation, drawing upon Cutlack's engineering work, identified the tunnel as too steep to meet the relevant safety recommendations when considered as part of emergency egress provision.

Its geometry also mattered during ingress.

People entering through the tunnel could not readily appreciate the density conditions that awaited them at its far end. Survivor evidence records individuals entering apparently normally and then suddenly being carried forward by the pressure developing behind them.

In crowd-management terms, this is an example of a commitment route.

Once people had moved sufficiently far into the tunnel and density increased, their ability to:

change destination,

stop,

reverse direction,

or redistribute laterally

became progressively reduced.

The safest decision therefore needed to be made before entry into the route.

Section 6 · Crowd movement and mechanism

Barrier layout, density, pressure and structural failure

Barrier 144 and the unobstructed path

6.15 An alteration intended to improve circulation changed the way forces could develop

Barrier 144 had previously stood directly ahead of the central tunnel.

Police officers had complained that spectators reaching it could stop and create congestion backing into the tunnel. Part of the barrier was consequently removed.

Cutlack later concluded that although the alteration had been intended to improve safety, it created an unobstructed path for a crowd surge from the tunnel.

This finding must be interpreted carefully.

Cutlack did not conclude that removing barrier 144 directly caused the later collapse of barrier 124A. The two issues should not be conflated.

The operational lesson is more subtle: removing an obstruction can improve ordinary circulation while simultaneously altering how movement and forces behave under abnormal high-density conditions.

Reference — IOPC/Operation Resolve, Changes to the Barrier Layout

This section examines barrier 144, the reasons for its alteration and Cutlack's later engineering assessment.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/changes-barrier-layout

Rapid transition to dangerous compression

6.16 The crowd in the pens changed state at approximately 2.55 pm

Witness accounts repeatedly describe a sudden change rather than a slow, barely perceptible increase in discomfort.

Operation Resolve found that a common theme was a rapid intensification of pressure at around 2.55 pm, consistent with the large inflow following the 2.52 pm Gate C opening. An inspector observing from the West Stand described what appeared to be a “river” or wedge of spectators entering from the tunnel and moving forward without the normal backward movement following a surge.

Survivors described being lifted from their feet, carried by the crowd, pinned against barriers and fencing, and losing any ability to determine their own movement.

This distinction is fundamental.

At sufficiently severe compression, a crowd is no longer behaving as thousands of independent pedestrians who can simply be instructed individually to move elsewhere.

The physical interaction between bodies becomes dominant.

Density and pressure are related but different

6.17 Density describes occupancy; pressure describes forces

The distinction between density and crowd pressure should be understood clearly.

Density describes how many people occupy a particular area.

Pressure concerns the forces that arise when those people are in sufficiently close contact that movement or force applied in one location is transmitted through surrounding bodies.

High density therefore increases the possibility of dangerous pressure, but two crowds at the same average density may not necessarily experience identical forces. Geometry, movement, gradients, barriers, incoming flow and depth of crowd all matter.

Engineering analysis of Hillsborough demonstrates this directly. Cutlack concluded that the force imposed upon barrier 124A was affected not merely by density but by the depth of the crowd behind the barrier and the arrangement of another barrier higher up the terrace.

Modern crowd-dynamics research similarly distinguishes simple crowd density from conditions in which contact forces become transmitted between bodies and individual control of movement is lost. That literature should be used to interpret Hillsborough cautiously rather than retrospectively claiming that concepts developed later formed part of the 1989 planning framework.

Academic reference — Helbing & Mukerji, Crowd Disasters as Systemic Failures: Analysis of the Love Parade Disaster (2012)

Although this paper concerns Duisburg rather than Hillsborough, it provides useful later crowd-science explanation of force transmission, systemic failure and why dangerous crowd movement should not automatically be interpreted as deliberate pushing or panic.

https://link.springer.com/article/10.1140/epjds7

Crush barriers

6.18 Crush barriers were intended to interrupt the depth of crowd loading

The barriers across a standing terrace were not simply obstacles.

Their purpose included limiting the depth of crowd that could develop on a slope and absorbing forward loading before force accumulated across too great a mass of spectators.

The HSE inspection immediately following the disaster found numerous departures from the 1986 Green Guide within pens 3 and 4. Four of five barriers in Pen 3 and six of nine in Pen 4 did not meet the recommended height. Numerous gaps also failed to meet recommended dimensions, and some barrier spacing was non-conforming.

This matters because the safety performance of standing accommodation depends not merely upon the presence of barriers but upon their height, strength, spacing, continuity and relationship to crowd depth.

Barrier 124A

6.19 The collapse of barrier 124A was a consequence of exceptional loading

Barrier 124A in Pen 3 failed during the crush.

HSE examination found that it was approximately sixty years old, made partly from wrought iron, and had significant corrosion beneath attachment straps and around support components.

Later engineering evidence nevertheless makes it important not to reduce the disaster to a simple “old barrier failed” explanation.

Cutlack concluded that the barrier was subjected to a load greater than its design capacity because of three interacting factors: crowd density, the depth of crowd behind the barrier, and the inadequate height of barrier 136 further up the terrace, which allowed greater forward loading to reach the lower barrier.

Thus structural failure occurred within an already severely overloaded crowd system.

The barrier collapse then further reduced the ability of those immediately around it to remain upright and protected.

Reference — HSE, The Hillsborough Incident 15 April 1989: An Investigation into Various Technical Aspects Prepared for the Court of Inquiry, IR/L/ME/MM/89/1

This June 1989 technical report contains HSE's early examination of pens 3 and 4, barrier dimensions and condition, turnstiles and capacity calculations.

https://www.hse.gov.uk/foi/releases/hillsborough/memm891.pdf

Reference — HSE, Examination of Crush Barriers from Pens 3 and 4, IR/L/MM/89/11

This separate metallurgical and engineering examination records the physical condition of barrier 124A and other barriers following the disaster.

https://www.hse.gov.uk/foi/releases/hillsborough/mm8911.pdf

Section 6 · Crowd movement and mechanism

Perimeter restraint, escape, segmentation and the closed-box problem

The perimeter fence

6.20 The front of the terrace prevented forward relief

The crowd at the bottom of pens 3 and 4 encountered the perimeter fence separating spectators from the pitch.

That fence had been installed within a football-safety environment strongly concerned with pitch incursions and spectator segregation. Under ordinary conditions it prevented movement onto the playing surface.

Under severe compression it also prevented the crowd from expanding forwards.

People at the front therefore became trapped between:

the inflow and crowd mass behind them,

crush barriers within the terrace,

radial fences at the sides,

and the perimeter fence in front.

Operation Resolve records that by 2.55–2.57 pm spectators were climbing the perimeter and radial fences in attempts to escape.

This illustrates the difference between containment and safe crowd management.

A barrier may successfully prevent movement in normal circumstances yet create additional consequences during emergency conditions unless sufficient controlled release routes are available.

Emergency gates

6.21 The available release openings were inadequate

Pens 3 and 4 had narrow gates within the pitch-perimeter fence.

HSE measured the Pen 3 gate at approximately 0.81–0.82 metres clear width and the Pen 4 gate at approximately 0.77–0.79 metres. The relevant guidance called for at least 1.1 metres.

HSE therefore concluded that both gates failed to conform to that recommendation.

Operation Resolve's modern engineering assessment likewise identifies the emergency exits from pens 3 and 4 as unsuitable, noting both the steep central tunnel and narrow perimeter gates.

Once the crowd had become critically compressed, these openings could not provide a discharge rate remotely comparable to the inflow that had been entering through the central tunnel.

This is another crucial flow relationship:

large upstream inflow + small emergency release capacity = rapid local accumulation when downstream holding capacity is exceeded.

Lateral escape was also restricted

6.22 Radial fencing limited redistribution

The radial fences installed to assist segregation and crowd control subdivided the terrace physically.

When pens 3 and 4 became overloaded, those fences prevented easy lateral expansion into the comparatively empty side pens. Movement was possible only through limited openings or by climbing the fences themselves.

The same feature therefore had different effects under different conditions.

Under normal conditions, subdivision could support segregation and organisational control.

Under abnormal conditions, it reduced the ability of excess crowd density to redistribute naturally.

For crowd managers, physical segmentation must therefore always be assessed together with:

how each compartment is filled, how its occupancy is monitored, how inflow can be stopped, and how occupants can leave it in an emergency.

The “closed-box” problem

6.23 Pens 3 and 4 effectively behaved as constrained compartments

From a crowd-flow perspective, the centre pens operated as constrained spaces.

People could enter rapidly through the tunnel.

Lateral redistribution was restricted by radial fences.

Forward movement was stopped by the perimeter fence.

Emergency gates were narrow.

The tunnel itself was unsuitable as the sole substantial reverse escape route, particularly while continued inflow was occurring.

This arrangement meant that once incoming demand exceeded the pens' remaining holding capacity, there was little space into which that additional demand could dissipate. The consequence was not simply “overcrowding” as an abstract condition. Volume continued to be introduced into a space whose effective capacity to absorb or discharge that volume had been exhausted.

An engineering paper subsequently published in Engineering Failure Analysis specifically described the technical problem as gross overcrowding within enclosed sections followed by failure of a crush barrier.

Academic reference — R. A. Smith, The Hillsborough Football Disaster: Stress Analysis and Design Codes for Crush Barriers (1994)

This engineering paper examines the failure of the crush barrier and discusses technical aspects of the crowd loading and applicable design requirements.

https://doi.org/10.1016/1350-6307(94)90017-5

Section 6 · Crowd movement and mechanism

Loss of individual control, behaviour and recognition

Loss of individual control

6.24 People were being moved by the crowd rather than moving through it

A recurring survivor description concerns feet leaving the ground and bodies being carried forward.

This is a particularly important indicator of critical crowd conditions.

Once surrounding contact and force become sufficient to move a person irrespective of their intended direction, instructions such as “move back”, “stop pushing” or “move sideways” may no longer be physically achievable.

One survivor entering shortly before the major surge described being carried forward into Pen 3 with his feet no longer touching the ground. Others were pinned against the perimeter fence or barriers and unable to alter their position.

For those learning crowd management, observable signs such as involuntary movement, people lifted from their footing, waves passing through a crowd, people attempting to climb barriers or spectators reporting inability to breathe must be regarded as indicators of a critical physical condition, not merely poor behaviour.

Why “pushing” is an inadequate explanation

6.25 Force in a dense crowd is not evidence of deliberate aggression

When a person in a very dense crowd is pushed forward by pressure transmitted through people behind, somebody observing from outside may see movement without seeing the forces that caused it.

This can create misleading interpretations that spectators are deliberately “surging” or “pushing”.

Later crowd-science research has demonstrated that once physical contact becomes sufficiently extensive, forces can propagate through bodies and individuals may be displaced without voluntarily initiating movement.

This scientific understanding is consistent with the Hillsborough survivor evidence and with the 2016 jury finding that supporter behaviour did not cause or contribute to the dangerous situation at the Leppings Lane turnstiles.

The terminology used by crowd managers therefore matters.

Terms such as “crowd pressure”, “compression”, “involuntary movement” and “loss of individual control” describe the physical condition more accurately than automatically attributing it to deliberate pushing or panic.

Academic reference — Cocking & Drury, Talking about Hillsborough: ‘Panic’ as Discourse in Survivors' Accounts of the 1989 Football Stadium Disaster

This peer-reviewed study examines the use of “panic” in accounts of Hillsborough and places survivor testimony against assumptions that disaster crowds necessarily behave irrationally.

https://doi.org/10.1002/casp.2153

Recognition failure

6.26 The physical emergency was not immediately recognised from outside the crowd

People within pens 3 and 4 were experiencing conditions very differently from those observing from the perimeter track.

At 14:38:50 there had been little visible evidence of serious distress despite the centre pens already having little available space. Officers immediately outside the pens subsequently reported that they had not recognised significant difficulty by about 2.40–2.45 pm.

When conditions deteriorated dramatically, people began screaming and attempting to escape. Some police officers initially interpreted spectators coming through the perimeter gates as a potential pitch incursion. Gate 3 was initially reclosed after pressure forced it open.

This illustrates a major monitoring problem:

dangerous crowd pressure may develop internally before its severity is visually obvious to an observer standing outside the crowd.

Monitoring cannot therefore rely exclusively upon visual observation of the front edge.

Information should be obtained from multiple indicators: occupancy counts, rate of fill, CCTV, personnel within or above the crowd, crowd behaviour, individual reports, changing flow patterns and predetermined capacity thresholds.

Section 6 · Crowd movement and mechanism

Capacity control, dynamic flow and system imbalance

The absence of pen counting

6.27 No reliable closed-loop capacity system existed

Operation Resolve found no specific instruction allocating responsibility for monitoring the number of spectators within individual pens.

Inspector Harry White later stated that he had never received specific instructions concerning the capacity or rate of fill of individual areas. Officers generally kept an eye on conditions, but no defined system existed for identifying that a pen had reached capacity and then automatically stopping further admission.

This is a particularly important distinction:

observation is not the same as capacity control.

A proper capacity-control system requires:

a defined capacity,

a means of measuring occupancy,

knowledge of inflow and outflow,

a responsible decision-maker,

an intervention threshold,

and a mechanism for stopping or diverting flow.

At Hillsborough, those elements were not connected.

Static occupancy versus dynamic flow

6.28 A pen can become unsafe before the total venue becomes overcrowded

The disaster illustrates why total attendance figures can be misleading.

The HSE's best estimate for the number entering via A–G and Gate C was approximately 9,734, against the nominal 10,100 capacity of the West and North-West terraces. It considered the true figure unlikely to exceed approximately 10,124.

This is highly significant.

The crowd disaster therefore does not require an explanation based upon thousands of people beyond the overall ticketed capacity entering the relevant terraces.

The problem was the distribution of people within the available space.

A substantial number were concentrated into pens 3 and 4 while space remained elsewhere.

This is one of Hillsborough's most important crowd-management lessons:

A venue, stand or event can be below its overall capacity while a particular compartment, route, frontage or viewing area is dangerously overcrowded.

The interaction of flow and holding capacity

6.29 Hillsborough was fundamentally an imbalance between demand, flow and local holding capacity

The physical mechanism can now be reconstructed without relying upon behavioural explanations.

Spectators arrived at Leppings Lane.

The entrance service rate was inadequate for the remaining demand.

A dense external accumulation developed.

The accumulation itself began interfering with the processing system.

Gate C was opened to prevent serious injury outside.

Approximately 2,000 people entered during the principal opening at a much greater rate than the turnstiles had been providing.

No corresponding internal metering or redirection was established.

The central tunnel remained open.

The tunnel led directly towards the already-full centre pens.

Radial fencing limited lateral redistribution.

Perimeter fencing restricted forward release.

The central pen gates had inadequate width.

Additional people continued to enter.

Crowd depth and density increased.

Individuals lost control of their own movement.

Pressure accumulated against people, barriers and fencing.

Barrier 124A failed under excessive loading.

Escape eventually occurred through opened gates, over fences, into adjacent pens and upwards towards the West Stand.

That chain is considerably more useful to crowd-management learning than the simplified phrase “too many people entered through Gate C.”

Section 6 · Crowd movement and mechanism

Crowd-management learning — demand, processing and compartments

6.30 Crowd-management learning: demand must be measured against processing capacity

The first practical lesson is that arrival demand and service capability must be compared continuously.

It is insufficient to know only the number of people expected.

It must also be understood how quickly they are likely to arrive and how quickly the entry system can process them.

If 5,000 people are expected during the final 30 minutes and the processing system can safely admit only 3,000 during that period, an accumulation of approximately 2,000 should be anticipated unless arrival behaviour is changed or processing capacity is increased.

This is essentially what the HSE turnstile analysis exposes retrospectively at Hillsborough.

Modern SGSA ingress guidance now explicitly requires entry arrangements to process spectators without creating congestion outside while also ensuring that the resulting flow does not compromise safety immediately inside the ground.

https://sgsa.org.uk/physical-factors/circulation/ingress/

6.31 Upstream, processing and downstream capacities must be compatible

A second lesson is that increasing capacity at one point can simply move the problem elsewhere.

Gate C dramatically increased entry capacity.

But the route and holding capacity downstream did not increase.

In operational terms, the safe system is therefore governed not by the widest opening but by the ability of the whole route to accommodate the resulting flow.

A control room should therefore never assess an intervention such as opening an additional gate solely by asking:

“Will this relieve the queue?”

It should simultaneously ask:

“Where will this additional flow go?”

6.32 Each compartment requires its own capacity control

Pens 3 and 4 demonstrate why compartmentalised spaces need compartmentalised control.

A capacity assigned to an entire stand is inadequate where fences, barriers, corridors or other physical features divide the stand into spaces between which people cannot freely redistribute.

Each meaningful compartment should therefore have:

a defined capacity,

a method of monitoring occupation,

and a means of restricting further inflow.

That principle is reflected in modern SGSA guidance, which emphasises that spectator numbers entering specific sections should be accurately monitored and relayed to the control point.

https://sgsa.org.uk/wp-content/uploads/2021/09/Annex-C-Control-points.pdf

Section 6 · Crowd movement and mechanism

Crowd-management learning — routes, intervention, infrastructure and action

6.33 Route choice should be designed, not assumed

People tend to take obvious routes.

At Hillsborough, the most prominent route led directly into the most heavily occupied area.

The presence of empty capacity elsewhere did not automatically protect the crowd.

A safe crowd-management plan therefore needs to consider desire lines and the way the environment appears to somebody unfamiliar with it.

If alternative routes are safety-critical, they must be made usable through design, signage and active direction.

An empty area that people cannot easily identify or reach is not practically available capacity.

6.34 Intervention needs to occur before critical density develops

Once people have lost independent control of their own bodies, many conventional crowd-management interventions become ineffective.

A steward cannot reasonably solve severe compression by asking individuals to “move back” if they are physically unable to do so.

The objective must therefore be prevention rather than recovery.

The relevant warning signs occur earlier:

rate of fill increasing,

space visibly diminishing,

unequal loading,

reduced movement,

queues extending beyond their planned area,

processing rate deteriorating,

people attempting to retreat,

reports of discomfort,

and escape behaviour such as climbing structures.

Intervention at that stage can reduce or redirect inflow while people still retain sufficient mobility to respond.

6.35 Barriers do not create capacity

Another important lesson concerns infrastructure.

Barriers, fences and gates may assist safe crowd management, but their existence cannot justify increasing occupancy independently of their configuration and the management system around them.

The HSE work on pens 3 and 4 demonstrates that barrier height, spacing, gap alignment and the area actually protected by a barrier all influenced the usable holding capacity.

Physical infrastructure should therefore be regarded as one component of a system rather than evidence that an area is inherently safe.

Modern SGSA guidance expresses the same principle directly: safety at sports grounds depends upon the balance between good management and good design.

https://sgsa.org.uk/training-events-advice/key-principles-of-sports-grounds-safety/

6.36 “Full” requires an action

A final and exceptionally important operational lesson is that knowing an area is full is of little value unless that condition is connected to an intervention.

At Hillsborough, the centre pens becoming full did not automatically cause the central tunnel to be closed.

There was no predetermined trigger.

There was no clearly assigned individual required to make the decision.

There was no corresponding diversion arrangement waiting to be activated.

The 2016 jury specifically found that commanding officers failed to recognise that pens 3 and 4 were at capacity before Gate C was opened and should have ordered closure of the tunnel.

In a modern crowd-management framework, this can be expressed simply as:

Monitor → identify threshold → communicate → intervene → verify effect.

Without the intervention stage, monitoring is only observation.

Section 6 · Technical and academic references

Principal technical and academic references for Section 6

Principal technical and academic references for Section 6

Section 6 · Technical and academic references

Principal technical and academic references for Section 6 — continued

Reference 5 — HSE, IR/L/ME/89/33, An Investigation of the Turnstiles at the Leppings Lane Entrance

This provides contemporary engineering evidence concerning the physical turnstiles, counting system and relative admission demand placed upon the Leppings Lane entrance.

https://www.hse.gov.uk/foi/releases/hillsborough/me8933.pdf

Reference 6 — HSE, IR/L/ME/89/34, An Investigation into the Number of People Entering the Stadium Through Turnstiles A to G and Through Gate C

This supplies the principal quantitative analysis of turnstile service rates and Gate C admissions.

https://www.hse.gov.uk/foi/releases/hillsborough/me8934.pdf

Reference 7 — HSE, IR/L/ME/89/35, An Estimation of the Maximum Allowable Capacities of Pens 3 and 4

This provides the detailed contemporary calculation reducing the combined central-pen maximum to 1,693 before further reductions for additional non-conformities.

https://www.hse.gov.uk/foi/releases/hillsborough/me8935.pdf

Reference 8 — HSE, The Hillsborough Incident 15 April 1989: An Investigation into Various Technical Aspects Prepared for the Court of Inquiry

This June 1989 report brings together early HSE findings concerning barriers, pens, gates, capacities and turnstiles.

https://www.hse.gov.uk/foi/releases/hillsborough/memm891.pdf

Section 6 · Technical and academic references

Principal technical and academic references for Section 6 — continued

Reference 10 — Nicholson et al., The Investigation of the Hillsborough Disaster by the Health and Safety Executive, Safety Science, 1995

This peer-reviewed article summarises the HSE technical investigation, including barrier testing, crowd-pressure modelling and estimates of spectator ingress.

https://doi.org/10.1016/0925-7535(94)00034-Z

Reference 11 — Smith, The Hillsborough Football Disaster: Stress Analysis and Design Codes for Crush Barriers, Engineering Failure Analysis, 1994

This paper concentrates upon structural loading and failure of the terrace barrier and is particularly useful for the engineering component of the case study.

https://doi.org/10.1016/1350-6307(94)90017-5

Reference 12 — Cocking & Drury, Talking about Hillsborough: ‘Panic’ as Discourse in Survivors' Accounts of the 1989 Football Stadium Disaster, 2014

This paper provides valuable analysis of survivor accounts and challenges simplistic assumptions that “panic” provides an adequate explanation for crowd behaviour during the disaster.

https://doi.org/10.1002/casp.2153

Section 6 · Conclusion

Section 6 conclusion

For those learning crowd management, the central lesson from Hillsborough is not simply that high density is dangerous. The deeper lesson is that crowd risk develops through relationships between demand, processing rate, route choice, local capacity, physical geometry, monitoring and intervention.

No evidence requires the behaviour of supporters to explain the physical mechanism. The centre pens were already at or close to capacity; the turnstile system could not process the outstanding demand before kick-off; a severe external crush developed; Gate C was opened to relieve it; a high-volume inflow was admitted without downstream routing; the obvious route remained the central tunnel; the centre pens could not safely absorb that flow; lateral and forward escape were constrained; and the resulting density and crowd depth produced forces that deprived individuals of control over their own movement and overloaded parts of the terrace infrastructure.

For professional crowd management, Hillsborough therefore provides a powerful systems principle: the crowd journey must be managed continuously from arrival to final position. A problem relieved at one point has not been solved if the intervention merely transfers excessive demand to the next part of the system.

Section 7 · Police command and control

Section 7 — Police Command and Control on the Day

The physical mechanism examined in Section 6 developed within an operational system that was intended to observe conditions, interpret information, make decisions and coordinate police resources. Understanding Hillsborough therefore requires examination not only of what happened to the crowd, but of how the police command system perceived and responded to the developing conditions.

Command and control on 15 April 1989 cannot be reduced to a single decision. The evidence demonstrates a sequence involving pre-match preparation, allocation of responsibility, observation, communication, assessment, escalation and intervention. Difficulties arose when information available in one part of the operation was not combined effectively with information available elsewhere.

Senior officers in the Police Control Box could observe the West Terrace directly and could monitor the Leppings Lane entrance through CCTV. Officers outside the stadium were experiencing the developing pressure at ground level. Other officers were positioned around the terrace and perimeter track. Sheffield Wednesday also possessed turnstile-count information capable of assisting an assessment of how many spectators had entered. These separate information sources were not converted into an effective common understanding of the developing risk.

The later Operation Resolve investigation consequently examined the actions of police officers outside the stadium, the decision not to postpone kick-off, the monitoring of crowd numbers within the pens, the opening of the exit gates and the failure to control or redirect the large inflow once Gate C was opened.

For crowd-management learning, Section 7 demonstrates that effective command requires more than senior personnel being physically present. Information must be gathered, interpreted and shared; responsibilities must be understood; emerging conditions must be compared against expected conditions; and decisions must be translated into coordinated action throughout the crowd system.

Section 7 · Command structure

The Police Command Structure

Overall match command

Chief Superintendent David Duckenfield

Duckenfield was the match commander and therefore the officer in overall charge of the South Yorkshire Police operation at Hillsborough. He intended to exercise that role principally from the Police Control Box.

His position placed him at the point at which information from inside and outside the stadium should have been brought together and converted into operational decisions.

Senior command support

Superintendent Bernard Murray

Murray had been closely involved in planning the fixture and had substantial previous experience of police operations at Hillsborough. He was positioned alongside Duckenfield in the Police Control Box during the critical pre-match period.

His experience made his advisory role particularly important because the match commander was comparatively unfamiliar with commanding major football fixtures at the stadium.

Inside the stadium

Superintendent Roger Greenwood

Greenwood was the senior operational commander inside the stadium and had experience of previous Hillsborough semi-finals. His responsibilities placed him close to the playing area and the spectator accommodation.

He later became the officer who physically approached the West Terrace, recognised the crushing conditions and moved to stop the match.

Leppings Lane exterior

Superintendent Roger Marshall

Marshall held responsibility for the sector covering the arrival of Liverpool supporters and the Leppings Lane entrance. He was therefore operating where the external congestion and compression first became critical.

He had supervised the area outside Leppings Lane during the football season and was among the senior officers closest to the developing external emergency.

A distributed command system

The structure meant that no single officer physically occupied every part of the operation. Instead, safe control depended upon information passing between senior officers responsible for different parts of the crowd journey.

Marshall could observe conditions outside Leppings Lane. Greenwood and other officers could observe conditions inside the stadium. Duckenfield and Murray occupied the central command position. The operational requirement was therefore not simply for each commander to perform a local function, but for their observations to be combined into a coherent picture of arrival demand, entrance performance, terrace loading and emerging risk.

This distinction becomes crucial as the chronology develops. The dangerous external crowd and the heavily loaded central pens were components of the same crowd system, yet they were not managed as a single connected problem.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-3/planning-process https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/events-15-april-1989

Section 7 · Match command

The Change of Match Commander

One of the most significant changes between the 1988 and 1989 FA Cup semi-finals was the replacement of Chief Superintendent Brian Mole by Chief Superintendent David Duckenfield as match commander.

Mole possessed extensive experience of police operations at Hillsborough and had commanded the 1987 and 1988 FA Cup semi-finals there. Duckenfield had previously worked at Hillsborough as an inspector, including at the 1980 FA Cup semi-final, but he had never previously commanded a match at Hillsborough and had never commanded a football fixture of comparable scale.

Operation Resolve did not conclude that Duckenfield's appointment as divisional commander was itself inappropriate according to the standards of the time. The more significant organisational issue was the expectation that the commander of F Division would automatically become the Hillsborough match commander, even where another officer possessed substantially greater relevant operational experience.

Previous command

Chief Superintendent Brian Mole

Mole had extensive experience overseeing policing at Hillsborough and had commanded both the 1987 and 1988 FA Cup semi-finals.

Those fixtures had exposed important operational issues, including congestion and previous crowd crushing at the Leppings Lane end.

1989 command

Chief Superintendent David Duckenfield

Duckenfield took command with only a short period in which to prepare after assuming leadership of F Division.

He lacked experience of commanding a football match of this scale and later acknowledged that he had not been sufficiently familiar with the stadium structures and facilities required to manage foreseeable events effectively.

The operational lesson does not rest simply upon whether an individual officer was formally senior enough to occupy the role. Critical command appointments should be matched to competence, relevant experience, local knowledge, preparation and the complexity of the operation being commanded.

This issue was compounded by what occurred on the morning of the match. Following the 10.00 am briefing, Duckenfield spent more than two hours away from the Police Control Box. Operation Resolve concluded that this period was not used with sufficient focus to familiarise himself with important areas of the stadium, discuss previous difficulties with experienced officers or obtain a detailed understanding of the developing arrival operation.

There was no evidence that Duckenfield or another officer on duty consumed alcohol during this period. The relevant criticism concerned preparation and familiarisation rather than personal misconduct of that nature.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-3/replacement-mole-match-commander https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/briefings-for-officers-on-duty

Section 7 · Information and situational awareness

The Police Control Box and the Available Information

Duckenfield and Murray entered the Police Control Box shortly before 2.00 pm, with the available evidence placing their arrival at approximately 1.45–1.50 pm.

The Police Control Box occupied an important position within the stadium operation. From it, senior command had both a direct view of the West Terrace and access to CCTV showing the approaches to the Leppings Lane entrance.

The significance of this position is that the principal elements of the developing problem were not entirely hidden. Conditions inside and outside the stadium could be observed through different channels. The command task was to bring those observations together.

Information source 01

Direct view of the West Terrace

The central pens were situated directly in front of the Police Control Box. The uneven distribution between the heavily occupied centre pens and the comparatively less occupied side pens was therefore capable of being observed from the command position.

Information source 02

CCTV of Leppings Lane

CCTV provided views of the entrance area outside the stadium. By approximately 2.30 pm it showed a dense accumulation of supporters at the Leppings Lane turnstiles.

Information source 03

Radio reports from operational officers

Officers outside the stadium could communicate changing conditions through the police radio system. Marshall's requests concerning the closure of Leppings Lane to traffic were among the indications that conditions outside were changing materially.

Information source 04

Turnstile-count information

Sheffield Wednesday's control arrangements contained turnstile-count information capable of showing how many spectators had already entered. Operation Resolve found that this information was readily available but was not consulted when the senior police command assessed whether sufficient time remained to admit the outstanding crowd before kick-off.

The information gap was not simply an absence of information

A central command-and-control issue was the failure to combine available information into a reliable operational picture. Officers outside knew about the developing pressure. Officers inside could see the loading pattern of the terrace. CCTV provided another perspective. Turnstile counts could have quantified admission progress.

What was absent was a sufficiently effective process for converting those separate observations into a shared assessment of how many people remained outside, how rapidly they could be admitted, where incoming spectators would go, and whether the receiving areas could safely accommodate them.

Responsibility for monitoring the pens

A further difficulty concerned responsibility for monitoring crowd loading within the West Terrace pens. Operation Resolve found that no officer had been given a documented instruction making them responsible for monitoring the capacity and safety of individual pens.

Some senior officers later described such monitoring as a matter of common sense. Duckenfield stated that he believed stewards had responsibility for monitoring the terraces, reflecting expectations within contemporary safety guidance. Sheffield Wednesday's own instructions, however, told its match-day personnel not to become involved in crowd control because that function was regarded as a police responsibility.

The result was an important control weakness: a safety-critical activity was considered important by several parties, but the operational arrangements did not establish an unambiguous person or team responsible for performing it.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/events-15-april-1989 https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/situation-pens

Section 7 · Emerging warning signs

The First Command Warning Signs — 2.15 to 2.30 pm

The developing emergency did not first become apparent at the moment Gate C was opened. By approximately 2.15 pm, a series of indicators was emerging outside the stadium that should have required increasingly active command attention.

Approx. 2.15 pm

The entrance system is visibly under pressure

Detective Superintendent Graham McKay later recalled observing officers having considerable difficulty controlling the crowd and recognising that the turnstiles were not coping efficiently with the increasing arrival demand.

Supporter accounts similarly describe the disappearance of identifiable queues and the development of a mass of people across the entrance area.

2.17 pm

Marshall requests closure of Leppings Lane to traffic

Superintendent Marshall estimated that approximately 6,000–8,000 supporters were in the Leppings Lane area, with people spilling from the footways into the road and interfering with traffic movement.

At 2.17 pm he radioed the Police Control Box requesting that Leppings Lane be closed to traffic.

Approx. 2.22 pm

A second road-closure request is required

The first request did not produce an immediate complete road closure. Marshall therefore transmitted again at approximately 2.22 pm because traffic was continuing to move through an area increasingly occupied by spectators.

Duckenfield and Murray later stated that, from the CCTV images they were viewing, they did not consider closure of the road necessary.

By 2.30 pm

The problem is visible from the command position

By approximately 2.30 pm CCTV showed a substantial crowd outside the Leppings Lane turnstiles. The disparity between the comparatively full Nottingham Forest accommodation and the still less occupied Liverpool accommodation elsewhere within the ground was also observable.

The developing operational question was therefore no longer simply whether spectators were arriving. It was whether the remaining demand could be safely processed through a constrained entrance and distributed into the available internal accommodation before the scheduled kick-off.

The 2.30 pm decision point

At around 2.30 pm Duckenfield and Murray discussed whether the 3.00 pm kick-off should be delayed so that spectators could enter safely.

Their pre-established criteria were narrow and focused primarily upon circumstances such as severe weather or major traffic problems causing large numbers of spectators to arrive late. No such external cause had been reported.

Murray advised that sufficient time should remain to admit the waiting supporters. The decision was therefore taken to retain the scheduled kick-off.

Crucially, the decision was made without consulting Greenwood inside the stadium or Marshall outside, and without checking the available turnstile-count data. The assessment was therefore made without combining several significant sources of information already available to the command system.

For crowd-management education, this represents an important escalation point. The relevant question was not simply whether there had been an exceptional external cause for late arrival. The operational condition itself had changed: demand was accumulating faster than the entrance could process it. Once that condition existed, the consequences of maintaining the original timetable required reassessment regardless of why the crowd had accumulated.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/build-up-crowd https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/consideration-delaying-kick-off

Section 7.5 · Escalating external conditions

The External Emergency — 2.30 to 2.48 pm

The decision not to delay kick-off did not stabilise conditions outside Leppings Lane. During the following eighteen minutes the crowd changed from a serious entrance-management problem into an immediate threat to life.

The seven turnstiles serving the West and North-West terraces were unable to process the outstanding demand at the rate necessary to admit those waiting before kick-off. As the external density increased, the pressure itself progressively interfered with the operation of the turnstiles.

After 2.30 pm

Throughput falls as crowd pressure rises

Contemporary HSE analysis subsequently calculated an average admission rate of approximately 660 persons per turnstile per hour through turnstiles A–G between 2.05 pm and 2.50 pm.

After approximately 2.35 pm the rate fell. The HSE considered crowd forces acting upon spectators attempting to enter the turnstile booths to be a likely explanation.

Approx. 2.35–2.45 pm

Ordinary congestion becomes severe compression

Supporters described losing control over their own movement, being pressed against walls and turnstiles, being unable to move away from the crowd and struggling to breathe.

Turnstile personnel recalled spectators emerging distressed and breathless. Mounted officers also became trapped within the crowd and some later described their horses being physically lifted by the pressure.

Before 2.47 pm

Attempts are made to restrict further arrival

Attempts were made to close outer perimeter gates so that additional spectators would not continue moving towards the already overloaded turnstile area.

At least one of the gates subsequently opened under crowd pressure after its retaining arrangement failed. The ability to regulate the crowd before it reached the turnstiles was therefore deteriorating at the same time as conditions immediately outside the entrance became more dangerous.

2.47 pm

Marshall requests that the exit gates be opened

Superintendent Roger Marshall requested authority from the Police Control Box to open the wide exit gates at the Leppings Lane end. The purpose was to relieve the dangerous compression outside.

Inspector Robert Purdy had forced his way through approximately 30 yards of densely packed spectators and reported that people at the front were being crushed.

Marshall understood the competing risk. Opening an exit gate would relieve pressure outside but would permit spectators to enter the stadium without passing through the normal turnstile system.

The command problem had changed

By this stage the question was no longer whether ordinary admission arrangements could be maintained. An emergency intervention was required because police officers on the ground believed that people might be killed if the external pressure was not relieved.

The safety-critical requirement was therefore twofold: the external crowd had to be decompressed, while the consequences of the resulting inflow inside the stadium also had to be controlled.

Section 7.6 · Gate-opening decisions

Gate C — Command Authority and the First Opening

The opening of Gate C has often been reduced to a single decision. The surviving evidence demonstrates a more complicated sequence involving repeated requests from the external commander, more than one opening of the gate and uncertainty over the immediate authority for the principal opening.

Repeated requests from the Leppings Lane sector

Marshall's original request did not immediately produce the required relief. Further urgent radio communication followed. The developing situation outside was therefore known within the police communication system before the principal inflow occurred.

The request to open an exit gate presented a foreseeable secondary problem: spectators admitted in this way would bypass the normal controlled admission route and emerge directly onto the inner concourse.

14:48:23 — the first significant opening of Gate C

At approximately 14:48:23, Gate C opened while a police officer was approaching it from inside with a supporter who was being ejected.

The gate remained open for slightly more than thirty seconds. Operation Resolve estimated that approximately 130–180 spectators entered. Contemporary HSE video analysis produced a similar estimate of approximately 150.

Mounted officers recovered sufficient control for the gate to be closed.

The first opening provided an immediate warning of what opening Gate C could produce: a large admission flow could occur within seconds, bypassing the turnstiles and placing spectators directly onto the internal concourse.

The downstream system was not prepared

Personnel responsible for the internal concourse were not given effective advance warning that spectators were being admitted through Gate C.

No corresponding control was established at the central tunnel, no capacity check of pens 3 and 4 was made before further admission, and no routing system was introduced to send the additional spectators towards less occupied areas.

Duckenfield's instruction to open the gates

As Marshall continued to request relief, Chief Superintendent Duckenfield gave an instruction to open the gates.

Earlier accounts generally treated the principal reopening of Gate C as the direct execution of that instruction. Operation Resolve's later frame-by-frame reconstruction introduced an important evidential qualification.

Although the instruction was given, Operation Resolve did not identify an officer who stated that Gate C was physically reopened at 14:52:37 because that officer had received Duckenfield's instruction.

The precise immediate chain of authority for the physical reopening therefore remains unresolved. That evidential uncertainty should be retained rather than replaced by a simplified account.

Section 7.7 · The pivotal intervention

14:52:37 — The Principal Gate C Inflow

At approximately 14:52:37, Gate C was opened again. Operation Resolve identified steward Ian Marsh, assisted by another steward, as physically opening the gate.

Police personnel were attempting to relieve the external crush. Sergeant John Morgan had been guiding groups towards Gate C and Inspector Purdy had been attempting to regulate numbers with mounted officers. For a short period an element of control remained.

14:53:20

A temporary police line

CCTV shows mounted police creating a line across the service road and temporarily regulating the approach towards Gate C.

This demonstrates that controlled admission through a wide gate was operationally possible for at least a short period.

Approx. 2,000 admissions

The rate of entry changes dramatically

HSE analysis counted about 1,800 spectators and considered approximately 2,000 the best estimate for the principal opening, with the true number unlikely to exceed roughly 2,200.

Peak flow through Gate C was measured at around 10 persons per second, later settling nearer six persons per second.

After 2.54 pm

Outer-perimeter control deteriorates

Shortly after 2.54 pm an outer perimeter gate opened under pressure and other gates followed. The comparatively regulated approach towards Gate C consequently became a much larger movement.

14:57:01

The inflow is still continuing

More than four minutes after the principal opening began, CCTV still showed large numbers of spectators entering through Gate C.

No equivalent control had been established on the inner concourse to manage where those spectators went.

The intervention changed one part of the crowd system but not the next

Opening Gate C successfully reduced the dangerous pressure outside the turnstiles. It simultaneously created a substantially higher rate of admission into the stadium.

The command failure was not simply that an exit gate had been opened. It was that the changed inflow was not matched by a changed internal control system. No downstream arrangement was introduced to prevent the additional demand from being transferred directly towards the already heavily occupied central pens.

Section 7.8 · Internal control

The Downstream Command Failure

The principal command-and-control failure associated with Gate C occurred after spectators had crossed the threshold. The admission intervention was not linked to a system for controlling the destination of those entering.

01

The central tunnel remained open

Immediately beyond Gate C, the central tunnel presented the most obvious route towards standing accommodation. The word “STANDING” was displayed above it.

The tunnel descended directly towards pens 3 and 4.

02

The condition ahead could not be seen

Spectators entering the tunnel could not see the density within pens 3 and 4 before committing to the route.

The system therefore depended upon organisers and police knowing the condition of the receiving area and regulating access accordingly.

03

No effective pen-capacity monitoring system existed

No documented operational arrangement assigned an officer the specific responsibility of continuously monitoring the capacity and loading of the individual terrace pens.

Different organisations held different assumptions about who was responsible for monitoring and crowd control. A safety-critical function was therefore not translated into an unambiguous operational responsibility.

04

No cordon closed the tunnel

No police cordon or barrier was established across the entrance to the central tunnel before the large Gate C inflow.

Spectators consequently continued to follow the obvious route towards the part of the terrace that was already most heavily occupied.

05

No active redistribution took place

Significant space remained within the side pens. No effective system was created to direct the major incoming flow towards those areas.

The safety issue was therefore one of local distribution and local capacity, not simply total attendance.

Gate A provides an important comparator

Gate A was also opened to relieve the external crowd. Before entry was permitted, however, police established an internal cordon and incoming spectators were actively directed towards the North Stand.

The comparison demonstrates that opening an exit gate was not inherently incompatible with safe control. The outcome depended upon whether the resulting movement was received, regulated and routed downstream.

Section 7.9 · Recognition of the emergency

Delayed Recognition and Stopping the Match

The command failure did not end when the crowd entered the central pens. A further delay occurred before the developing crowd crush was recognised as a mass-casualty emergency.

Approx. 2.59 pm

The match begins

Operation Resolve's synchronised reconstruction places kick-off at approximately 2.59 pm.

By then spectators were already escaping from the central pens through perimeter gates, over fences and towards the pitch. The emergency was therefore already developing before play commenced.

3.00–3.02 pm

Greenwood moves towards the Leppings Lane terrace

Superintendent Roger Greenwood saw spectators passing through or climbing the perimeter fencing and recognised that something unusual was happening.

By 15:02:01 he had reached the area in front of pen 3.

He remained unaware of the severe external crush and the preceding Gate C admission sequence. Information known outside the ground had not been integrated with the situation now developing inside.

Initial response

The incident is interpreted through a public-order framework

Personnel within the Police Control Box initially interpreted spectators emerging onto the track and pitch as a possible pitch invasion or public-order problem.

Dog handlers were requested and some responding officers understood that they were being sent to deal with disorder.

The initial interpretation therefore shaped the first response before the real nature of the incident was understood.

Approx. 3.04 pm

Greenwood recognises the crush

Having reached the West Terrace, Greenwood recognised that spectators were being crushed.

He signalled towards the Police Control Box for the match to be stopped and then moved onto the pitch to contact referee Ray Lewis directly.

Approx. 3.05 pm

Play is stopped

Greenwood reached the referee and the match was stopped at approximately 3.05 pm.

The later synchronised reconstruction provides a more precise basis than older accounts that frequently record 3.06 pm.

Situational awareness was fragmented

The external commander knew that a dangerous crush had developed at the turnstiles. Senior command knew that the exit gates had been opened. The central terrace could be observed from the Police Control Box. Greenwood could see spectators escaping onto the track.

Those observations were not assembled rapidly enough into a shared understanding that a crowd-compression disaster was occurring within pens 3 and 4.

Section 7.10 · Emergency command

Emergency Command After the Match Was Stopped

Stopping the match did not automatically create an effective emergency command structure. The early response remained influenced by the mistaken public-order interpretation and by incomplete communication about the nature and scale of the casualties.

15:05:37

Operation Support is requested

Within seconds of the match being stopped, a Police Control Box transmission requested implementation of Operation Support.

Within South Yorkshire Police this was principally associated with a response to serious disorder. Officers responding to the request were therefore not necessarily told that they were being sent to a mass-casualty rescue incident.

15:06:19

A police cordon begins to form

CCTV shows officers apparently being formed into a cordon on the pitch.

Such a formation was consistent with the belief that a pitch invasion or public-order incident might be occurring. Once officers reached the affected spectators, many rapidly recognised the true situation and moved instead to assist casualties.

Approx. 3.07–3.08 pm

Murray requests ambulances

Superintendent Murray returned to the pitch and recognised that people were trapped and injured. He radioed for ambulances, and a request subsequently passed through the Force Control Room for a “fleet of ambulances”.

The information reaching the ambulance service did not yet provide a complete picture of the scale of the emergency.

Approx. 3.10–3.11 pm

Rescue develops before unified command

Police officers and supporters were already attempting to release casualties from the pens. People were pulled through perimeter gates, lifted into the West Stand and helped across the radial fences.

The response was largely improvised and personnel sometimes obstructed one another in the urgency of the rescue.

Approx. 3.11 pm

Nesbit introduces greater organisation

Chief Superintendent Terry Nesbit reached the area and recognised that the extraction effort required greater structure.

Officers were organised into chains so that casualties could be moved more systematically from the affected terrace.

For emergency management, the distinction is important: large numbers of people performing rescue activity do not by themselves constitute an effective command system. Command must establish the nature of the incident, communicate priorities, coordinate resources and ensure that other emergency services receive an accurate operating picture.

Section 7.11 · Command conclusions

Failure to Establish a Unified Major-Incident Picture

The established major-incident arrangements were not activated in a way that rapidly created unified command between the police, ambulance service and other responders.

The ambulance service progressively acquired information indicating that large numbers of people had been crushed. At 15:12:08 its control room received information that substantial numbers might be affected, and by 15:13:54 an officer at the ground was reporting the possibility of fatalities.

At 15:18:42 an ambulance officer radioed that Hillsborough constituted a major incident. Operation Resolve found that this information was not propagated through the ambulance system as effectively as required.

The result was that the response developed through local action, improvised rescue and separate organisational decisions before an effective shared emergency picture emerged.

Information existed but was fragmented

Information about external compression, turnstile performance, Gate C, terrace loading and people escaping onto the pitch existed in different parts of the operation. It was not integrated sufficiently quickly.

Responsibility did not guarantee understanding

The presence of a command hierarchy did not automatically generate situational awareness. Effective command depended upon commanders seeking, receiving, testing and combining information from across the crowd system.

An intervention must include its downstream consequences

Opening Gate C addressed the immediate external danger but substantially increased the rate at which spectators entered the internal concourse. No corresponding internal control was introduced.

Assumptions shaped the response

The initial interpretation of spectators appearing on the pitch as a possible public-order problem influenced the first police response and delayed shared recognition of a mass-casualty crowd incident.

Emergency command must identify the real problem rapidly

Resources cannot be coordinated effectively until the incident has been correctly characterised. At Hillsborough, rescue action developed before a sufficiently coherent multi-agency command structure had been established.

Section 7 conclusion

The principal command lesson from Hillsborough is not that one decision in isolation caused every subsequent failure. A sequence of command weaknesses interacted.

The match commander entered the operation with limited relevant command experience; important previous hazards had not been incorporated adequately into planning; operational information remained distributed between different commanders; the decision not to delay kick-off was made without consulting key information sources; the developing external emergency was relieved without effective downstream control; the central tunnel remained open; no reliable pen-monitoring trigger prevented further loading; the emerging disaster was initially interpreted through a public-order framework; and the transition from football policing to mass-casualty emergency management was not sufficiently rapid or coordinated.

For professional crowd management, the broader principle is that command must maintain a common operating picture across the whole crowd journey. A commander must understand not only what is happening at an intervention point, but what that intervention will cause at the next stage of the system.

At approximately 4.40 pm, former divisional commander Chief Superintendent Brian Mole returned to Hillsborough and assumed responsibility for the continuing police operation, allowing Duckenfield and Assistant Chief Constable Walter Jackson to return to force headquarters. By then the immediate crowd-compression phase had ended, but the casualty, family, identification and investigative consequences were only beginning.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/failure-to-declare-major-incident https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/end-of-rescue-effort

Section 7 · References 1–7

Principal References for Section 7

Section 7 · References 8–14

Principal References for Section 7 — continued

Section 7 · References 15–20

Principal References for Section 7 — continued

Reference 18 — HSE: An Investigation into the Number of People Entering Through Turnstiles A–G and Gate C, IR/L/ME/89/34

This contemporary technical analysis provides measured turnstile rates and estimates for the separate Gate C admission periods.

https://www.hse.gov.uk/foi/releases/hillsborough/me8934.pdf

Section 8 · Stewarding and organisational responsibility

Section 8 — Stewarding, Sheffield Wednesday FC, the Football Association and Other Organisational Responsibilities

The preceding sections have examined stadium design, crowd movement and police command. That analysis is incomplete unless the role of the stadium operator, its match-day personnel and the other organisations involved in staging the fixture are considered separately.

Hillsborough is particularly important for contemporary stewarding because it demonstrates that a large stewarding presence does not itself create an effective safety system. Personnel require clearly allocated functions, competent supervision, reliable information, defined escalation routes and an unambiguous relationship with police and venue management.

This section therefore examines the practical stewarding operation alongside the responsibilities of Sheffield Wednesday Football Club, Graham Mackrell as secretary and designated safety officer, the Football Association, Sheffield City Council, Eastwood & Partners and the interfaces between them.

8.1 Sheffield Wednesday was the stadium operator

Sheffield Wednesday Football Club owned and operated Hillsborough Stadium and held the Safety Certificate applying to the ground.

The club therefore possessed responsibilities that were separate from, although closely connected with, the policing operation. These included the physical safety of the premises, compliance with the Safety Certificate, spectator-admission arrangements, employment and deployment of match-day personnel and operation of the club's control and turnstile systems.

Operation Resolve concluded that the core responsibility for ensuring that the Safety Certificate remained current rested with Sheffield Wednesday.

8.2 The Green Guide placed substantial responsibility on ground management

The 1986 Guide to Safety at Sports Grounds envisaged stadium management taking active responsibility for spectator safety rather than regarding safety as exclusively a police function.

Within that model, stewards formed part of the ground-management safety system. Their functions included assisting the safe movement and dispersal of spectators and helping to prevent overcrowding.

This becomes particularly significant at Hillsborough because the operational instructions actually issued by Sheffield Wednesday did not align cleanly with that expectation.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/responsibilities-stadium-safety https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/situation-pens

Section 8 · Stewarding and organisational responsibility

Section 8 — Stewarding, Sheffield Wednesday FC, the Football Association and Other Organisational Responsibilities

The preceding sections have examined stadium design, crowd movement and police command. That analysis is incomplete unless the role of the stadium operator, its match-day personnel and the other organisations involved in staging the fixture are considered separately.

Hillsborough is particularly important for contemporary stewarding because it demonstrates that a large stewarding presence does not itself create an effective safety system. Personnel require clearly allocated functions, competent supervision, reliable information, defined escalation routes and an unambiguous relationship with police and venue management.

This section therefore examines the practical stewarding operation alongside the responsibilities of Sheffield Wednesday Football Club, Graham Mackrell as secretary and designated safety officer, the Football Association, Sheffield City Council, Eastwood & Partners and the interfaces between them.

8.1 Sheffield Wednesday was the stadium operator

Sheffield Wednesday Football Club owned and operated Hillsborough Stadium and held the Safety Certificate applying to the ground.

The club therefore possessed responsibilities that were separate from, although closely connected with, the policing operation. These included the physical safety of the premises, compliance with the Safety Certificate, spectator-admission arrangements, employment and deployment of match-day personnel and operation of the club's control and turnstile systems.

Operation Resolve concluded that the core responsibility for ensuring that the Safety Certificate remained current rested with Sheffield Wednesday.

8.2 The Green Guide placed substantial responsibility on ground management

The 1986 Guide to Safety at Sports Grounds envisaged stadium management taking active responsibility for spectator safety rather than regarding safety as exclusively a police function.

Within that model, stewards formed part of the ground-management safety system. Their functions included assisting the safe movement and dispersal of spectators and helping to prevent overcrowding.

This becomes particularly significant at Hillsborough because the operational instructions actually issued by Sheffield Wednesday did not align cleanly with that expectation.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/responsibilities-stadium-safety https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/situation-pens

Section 8 · Stewarding responsibility

Who Was Responsible for Monitoring the Terrace?

8.6 The Green Guide expectation

Chief Superintendent Duckenfield later said that he understood Sheffield Wednesday stewards to be responsible for monitoring the terrace pens.

Operation Resolve noted that this understanding was consistent with the Green Guide in one important respect: the Guide expected stewards to assist with safe spectator dispersal on terraces and prevent overcrowding.

8.7 Sheffield Wednesday's written instructions pointed in the opposite direction

Sheffield Wednesday's Instructions to match day staff told its stewards not to become involved in crowd control because crowd control was regarded as a police responsibility.

This created a fundamental contradiction between the general safety model described in the Green Guide and the operational instructions used at Hillsborough.

8.8 The contradiction was not confined to the club

Duckenfield told the Goldring Inquests that he had not seen the Sheffield Wednesday instructions. Operation Resolve subsequently established that the document had been shared with the police planning team.

At the same time, police officers deployed around the West Terrace were not given specific instructions making them individually responsible for monitoring the capacity or rate of filling of each pen.

8.9 Organisational ambiguity

The result was a serious safety-management gap. The police command believed stewarding had an important monitoring role; the club's own instructions told stewards that crowd control was a police responsibility; and individual police officers did not receive a clear operational instruction assigning them responsibility for pen-capacity monitoring.

8.10 An interface failure rather than simply an individual failure

This distinction is essential for crowd-management learners. The problem was not merely whether an individual steward happened to notice a crowded area.

The safety system itself failed to define who was required to monitor loading, what information they should use, what threshold should trigger intervention, who had authority to close a route and how that action should be communicated.

A responsibility that exists only as an assumption is not an effective operational control.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-4/situation-pens

Section 8 · Operational management

Briefing, Supervision and the Safety Officer

8.11 Stewards were briefed on the morning of the match

Taylor recorded that Sheffield Wednesday's stewards were briefed on the morning of 15 April by police inspectors before being allocated around the stadium.

This arrangement illustrates how closely police and stewarding functions were intertwined. It also reinforces why role boundaries needed to be particularly clear: a steward could receive a police briefing while remaining employed as part of the club's match-day safety system.

8.12 Briefing is not a substitute for written responsibility

There is no evidence of a briefing instruction that established a complete stewarding process for monitoring individual West Terrace pens, reporting capacity concerns and closing or controlling access when a pen became full.

Where a safety-critical responsibility depends upon local observation, briefing should identify the observation point, escalation trigger, reporting route and intervention authority.

8.13 Graham Mackrell held several significant club roles

Graham Mackrell was Sheffield Wednesday's secretary and was also the club's designated safety officer and responsible officer for the purposes relevant to the Safety Certificate.

His role therefore crossed administrative, operational and safety-management functions. Decisions affecting ticket allocation, spectator admission and turnstile arrangements fell within matters in which the club had direct responsibilities.

8.14 The safety officer function had to connect planning with match-day delivery

The presence of a named safety officer did not eliminate the need for a functioning safety-management system.

The role required information concerning capacities, entrance arrangements, steward deployment and stadium configuration to be translated into practical controls before spectators arrived.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/responsibilities-stadium-safety

Section 8 · Spectator admission

Turnstile Provision, Ticketing and Wayfinding

8.15 The Leppings Lane turnstile allocation

Almost 24,000 Liverpool supporters were required to enter through the Leppings Lane end using 23 turnstiles.

Within that arrangement, seven turnstiles served the 10,100 Liverpool standing places associated with the West and North-West terrace accommodation.

By comparison, 21,000 Nottingham Forest supporters allocated to the Spion Kop had 42 turnstiles available.

8.16 Mackrell authorised the altered turnstile allocation

Operation Resolve found that the change in allocation between the 1988 and 1989 semi-finals was made by Graham Mackrell.

The police Operational Order did not identify the change, meaning that experienced supervisory officers at Leppings Lane were not formally briefed about an alteration that materially affected entrance demand.

8.17 The later criminal conviction

On 3 April 2019, Mackrell was convicted of failing to discharge a duty under the Health and Safety at Work etc. Act 1974 in relation to spectator-admission arrangements.

Sir Peter Openshaw concluded that proper consideration of the altered allocation should have identified the obvious risk that so many spectators could not pass through seven turnstiles in sufficient time and that a dangerous crowd could consequently develop outside.

Mackrell was fined £6,500 and ordered to pay £5,000 costs.

8.18 Ticketing and signage affected route choice

The Leppings Lane entrance arrangements were not intuitive. The three principal ticket/turnstile designations appeared in the sequence A, C, B.

Spectators using turnstiles A–G for the terrace entered an internal concourse where the most obvious route was directly ahead through the central tunnel. Above that tunnel were the words “STANDING” and the letter B.

Alternative routes towards the side pens existed but were not conspicuously signposted. Wayfinding therefore reinforced movement towards the central pens.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-3/significance-change-turnstile-allocation https://www.judiciary.uk/wp-content/uploads/2019/05/Sentence-Mackrell.pdf

Section 8 · The Football Association

Venue Selection and Spectator Allocation

8.19 The FA selected Hillsborough

The Football Association selected Hillsborough as the venue for the 1989 FA Cup semi-final.

The decision was influenced by geographical location and the perceived suitability of the stadium. Hillsborough had hosted the corresponding semi-final in 1987 and 1988, and those fixtures were regarded by the FA, Sheffield Wednesday and South Yorkshire Police as having been successful.

No participating authority raised a formal objection to Hillsborough being used in 1989.

8.20 The allocation of ends was constrained by the policing requirement

Liverpool supporters were allocated the north and west sides of the stadium, with Nottingham Forest supporters allocated the south and east.

Liverpool FC secretary Peter Robinson asked the FA for the allocation to be changed so that more tickets could be made available to Liverpool supporters.

South Yorkshire Police stated that it would police the fixture only if the fundamental segregation arrangements used in 1988 were retained. The FA accepted that position.

The resulting allocation gave Nottingham Forest 27,754 tickets and Liverpool 23,542, with all Liverpool supporters required to approach their accommodation through the Leppings Lane end.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-2/choice-hillsborough-stadium-1989-fa-cup-semi-final

Section 8 · Other safety organisations

Certification, Engineering Advice and Oversight

8.21 Local-authority oversight

The local licensing authorities — first South Yorkshire County Council and later Sheffield City Council — had responsibilities within the sports-ground safety certification system.

Operation Resolve found that they did not insist upon a review of the Hillsborough Safety Certificate following important alterations to the stadium or earlier incidents of crowd crushing.

8.22 The club retained the core certificate responsibility

The failure of regulatory oversight did not transfer the club's own responsibility elsewhere.

Operation Resolve concluded that the core responsibility for ensuring the Safety Certificate remained current rested with Sheffield Wednesday.

8.23 Eastwood & Partners

Eastwood & Partners acted as Sheffield Wednesday's engineering advisers and were involved in stadium alterations and capacity advice.

Alterations to the West Terrace, including additional radial fencing, should have resulted in reconsideration of the relevant capacities and amendments to the Safety Certificate.

8.24 The West Terrace capacity was not adequately reassessed

In 1987 Sheffield Wednesday specifically asked Eastwood & Partners for advice concerning the West Terrace capacity following the series of alterations.

Eastwood & Partners advised that the capacity figure did not need to change. Later expert analysis concluded that this was unsafe and that the individual pens should have been assessed separately.

The organisational lesson

Certification, engineering advice, venue management and policing were separate functions, but they operated on the same physical crowd system. A weakness in one organisation therefore required recognition and challenge by the others rather than reliance upon the existence of a certificate or another organisation's involvement.

Section 8 · Fresh inquest findings

Organisational Findings Must Be Read Precisely

8.25 Sheffield Wednesday — preparation and management before the match

The fresh inquest jury was asked whether an error or omission by Sheffield Wednesday Football Club and its staff in the management of the stadium and/or preparation for the semi-final caused or contributed to the dangerous situation that developed.

The jury answered Yes.

Sheffield Wednesday — actions on 15 April itself

The jury was separately asked whether an error or omission by Sheffield Wednesday and its staff on the day caused or contributed to the dangerous situation at Leppings Lane and on the West Terrace.

The jury answered No.

When asked whether any such error or omission may have caused or contributed, the jury answered Yes.

8.26 Eastwood & Partners

The jury was asked whether Eastwood & Partners should have done more to detect and advise on unsafe or unsatisfactory features of Hillsborough Stadium that caused or contributed to the disaster.

The jury answered Yes.

Legal and evidential distinction

These findings must not be converted into claims that the jury made findings of individual criminal liability. The inquest determinations addressed causation and organisational errors or omissions. Separate criminal proceedings applied different offences, tests and standards of proof.

Section 8 · Match-day delivery

Stewarding Must Be Judged Within the System Provided

8.27 Individual personnel worked within unclear boundaries

The evidence does not support reducing the organisational stewarding failure to criticism of individual stewards.

Stewards were working within a system in which their written instructions limited involvement in crowd control, while senior police officers later said they believed stewarding should have monitored the terrace.

Turnstile operators and other club personnel encountered supporters who were visibly distressed as external pressure increased. Personnel at Gate C later became directly involved in the emergency opening of the gate.

The central safety question is therefore whether the overall management structure had equipped those personnel with sufficient information, responsibility, supervision and authority to identify and control the developing risk.

Local action could not compensate for missing system controls

A steward located at one point could not independently know the number of spectators still outside, the rate at which the turnstiles were processing them, the loading of every terrace pen and the intention of police commanders.

Those elements had to be connected through the management and control structure.

Section 8.28 · Operational learning

What Modern Stewarding Should Take From Hillsborough

Role clarity

Every safety-critical function must have an identified owner. “Someone is watching it” is not an operational allocation.

Monitor the receiving space

Entrance counts must be supplemented by local monitoring of the specific areas into which spectators are being delivered.

Define intervention thresholds

Personnel need to know what condition requires admission to slow, stop or divert and who possesses the authority to order that change.

Brief the complete crowd journey

Stewards should understand not just their fixed position but how their area connects with arrival, ingress, internal movement, capacity, egress and emergency procedures.

Interface with police explicitly

Where police are deployed, the division between policing functions and venue crowd-management functions must be written, briefed and understood by both organisations.

Do not confuse numbers with competence

A large personnel deployment cannot compensate for unclear duties, insufficient supervision or missing safety controls.

Control-room information must drive action

CCTV, counting systems and radio communication only improve safety when somebody interprets the information and acts upon defined thresholds.

Wayfinding is crowd control

Signs, route visibility and the physical geometry of entrances influence where people go. Safe distribution cannot depend solely on spontaneous spectator choice.

Section 8 · Conclusion

Section 8 Conclusion

The stewarding operation at Hillsborough cannot properly be assessed by counting how many people Sheffield Wednesday placed on duty. The club deployed a substantial match-day workforce and possessed communications, CCTV and computerised counting facilities. The critical question is whether those resources were organised into a coherent safety-management system.

They were not. The operational framework contained incompatible assumptions about responsibility for crowd control and terrace monitoring. Sheffield Wednesday's instructions told stewards not to become involved in crowd control, while police commanders later said that they understood stewards to carry significant responsibility for monitoring the pens. Police officers themselves had not been given a clear pen-monitoring responsibility.

At organisational level, the weaknesses extended beyond stewarding. Sheffield Wednesday retained responsibility for the Safety Certificate and admission arrangements; Mackrell authorised the altered turnstile allocation; the FA selected Hillsborough and accepted the policing requirement governing the allocation of ends; the licensing authorities did not require adequate revision of the Safety Certificate; and Eastwood & Partners' engineering advice did not identify and correct important capacity and layout problems.

The later inquest findings require precision. The jury found that errors or omissions by Sheffield Wednesday in stadium management and pre-match preparation caused or contributed to the dangerous situation. It did not find that day-of-match errors or omissions by the club caused or contributed, although it found that such errors or omissions may have done so. It also found that Eastwood & Partners should have done more to identify and advise upon unsafe or unsatisfactory stadium features.

For contemporary crowd management, the central lesson is therefore organisational: safety responsibilities must be explicit, coordinated and capable of being translated into action at the point where the crowd is actually moving. Stewarding, security, policing, venue management, engineering and regulatory oversight cannot operate as disconnected systems where each assumes another party is controlling the risk.

Principal References for Section 8 — 1 to 7

Principal References for Section 8 — 8 to 14

Principal References for Section 8 — 15 to 20

Section 9 · Emergency and medical response

Section 9 — Emergency and Medical Response

The emergency response to Hillsborough requires examination as a separate phase of the disaster. Once the lethal crowd compression had developed, the operational problem changed from preventing overcrowding to recognising a mass-casualty incident, releasing people from the pens, triaging casualties, providing treatment, moving the injured to appropriate care and coordinating multiple emergency organisations.

Substantial rescue activity did take place. Supporters, police officers, St John Ambulance volunteers, ambulance personnel, off-duty medical professionals and later fire-service personnel all attempted to assist casualties. Many individuals acted with initiative and courage.

The central failures were therefore not an absence of human effort. The later evidence identifies serious weaknesses in recognition, command, declaration of a major incident, inter-agency communication, triage, casualty clearing, deployment of medical resources and coordination of transport to hospital.

9.1 The emergency response must be understood as a system

An effective response required a chain: recognition → declaration → command → rescue → triage → treatment → casualty clearing → transport → hospital reception.

At Hillsborough, individual parts of this chain began operating, but they were not brought together quickly enough into a coherent multi-agency system.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/emergency-response

Section 9.2 · Pre-existing medical provision

Medical Resources Were Already Present

South Yorkshire Metropolitan Ambulance Service

SYMAS had personnel already on normal match duty inside Hillsborough before the disaster developed.

Station Officers Paul Eason and Patrick Higgins were supported by Qualified Ambulance Officers Stephen Chippendale and Leslie Worrall.

Their ambulance was positioned near the gymnasium, which was the stadium's designated casualty-treatment location.

St John Ambulance

St John Ambulance volunteers were also positioned around the stadium as part of the normal match-day medical provision.

When they first saw supporters leaving the pens, some did not immediately understand what had occurred. As they approached and recognised that spectators had been crushed, volunteers began providing treatment without waiting for central instruction.

The gymnasium

The gymnasium behind the North Stand had already been identified as a place to which casualties could be taken.

It had also previously been identified as a potential temporary mortuary in the event of a major incident.

The limitation was not simply resource availability

The fact that trained personnel, an ambulance, first-aid volunteers and a designated casualty area already existed is important.

The subsequent problems therefore centred substantially upon recognition, activation, coordination and deployment.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/initial-response-symas-sja

Section 9.3 · Recognition

Recognition Developed Gradually

Approx. 2.55–3.00 pm

Medical personnel initially lacked a clear picture

Like a number of police officers, some St John and SYMAS personnel initially interpreted the movement of people onto the pitch as possible crowd trouble rather than evidence of a mass-casualty crush.

15:05:48

SYMAS Control receives an early assessment

Station Officer Higgins contacted SYMAS Control and reported crowd problems and possibly one or two injured people, but indicated that the injuries might be slight.

15:07:15

The picture changes rapidly

During a telephone conversation between South Yorkshire Police and SYMAS Control, an urgent request was received from the Police Control Box for a “fleet of ambulances”.

The request followed Superintendent Murray's message from the pitch.

15:08–15:14

Severity becomes progressively clearer

At 15:08:01 Higgins advised that casualties existed and asked for the standby ambulance to be sent towards the gymnasium.

At 15:12:08 SYMAS Control reported information that substantial numbers might have been crushed. At 15:13:54 Higgins advised that some people might have died.

Section 9.3 · Recognition

Recognition Developed Gradually

Approx. 2.55–3.00 pm

Medical personnel initially lacked a clear picture

Like a number of police officers, some St John and SYMAS personnel initially interpreted the movement of people onto the pitch as possible crowd trouble rather than evidence of a mass-casualty crush.

15:05:48

SYMAS Control receives an early assessment

Station Officer Higgins contacted SYMAS Control and reported crowd problems and possibly one or two injured people, but indicated that the injuries might be slight.

15:07:15

The picture changes rapidly

During a telephone conversation between South Yorkshire Police and SYMAS Control, an urgent request was received from the Police Control Box for a “fleet of ambulances”.

The request followed Superintendent Murray's message from the pitch.

15:08–15:14

Severity becomes progressively clearer

At 15:08:01 Higgins advised that casualties existed and asked for the standby ambulance to be sent towards the gymnasium.

At 15:12:08 SYMAS Control reported information that substantial numbers might have been crushed. At 15:13:54 Higgins advised that some people might have died.

Section 9.4 · Major-incident activation

The Major Incident Was Not Properly Declared

The established procedure existed

South Yorkshire Police had a Major Incident Manual and a Major Incident Plan. The agreed mechanism for giving an unambiguous multi-agency warning included use of the code word “Catastrophe”.

A formal declaration would have alerted the emergency services immediately that the incident was of sufficient severity to require a comprehensive response and coordinated command structure.

Elements of the plan were started without the plan being properly activated

Duckenfield and Assistant Chief Constable Walter Jackson later described intending to implement the major-disaster arrangements.

Instructions were issued concerning ambulances, hospitals, a Casualty Bureau, off-duty police officers and other resources.

Operation Resolve nevertheless found no evidence that South Yorkshire Police actually declared a major incident or used the agreed code word.

Why this mattered operationally

Without an unambiguous declaration, other agencies received fragments of information rather than a recognised major-incident notification.

The result was partial mobilisation without the common understanding and command structure that the procedure was designed to create.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/failure-to-declare-major-incident

Section 9.5 · Rescue and extraction

Rescue Began Before Effective Command Was Established

Perimeter gates became rescue routes

As the central pens were opened, supporters began escaping through perimeter gates and over the fencing.

The narrow openings, severe pressure within the pens and number of casualties made extraction difficult.

The first rescue effort was largely improvised

Police officers and supporters pulled people through perimeter gates, lifted casualties towards the West Stand and helped people across radial fences.

Numerous participants later described personnel getting in each other's way because there was no effective central organisation.

Chief Superintendent Nesbit imposed greater structure

At about 3.11 pm, Chief Superintendent Terry Nesbit reached the Leppings Lane end and began organising officers into chains at the perimeter gates.

This created a more systematic process for carrying casualties from the terrace.

Supporters remained central to the rescue

Supporters continued to assist people from the pens and carry casualties across the pitch.

Advertising hoardings were removed and used as improvised stretchers because purpose-designed casualty-moving equipment was insufficient for the scale of the emergency.

Section 9.6 · Ambulance response

Mobilisation, Arrival and Access

15:09

Additional ambulances begin to be mobilised

SYP reiterated that as many ambulances as possible were required. SYMAS began identifying vehicles that could be released while maintaining normal emergency cover elsewhere.

15:14:19

First additional SYMAS ambulance arrives

The first additional ambulance entered through the Leppings Lane outer perimeter and stopped outside Gate C.

The crew recalled that police officers appeared surprised by its arrival and did not provide clear direction about where it was required.

15:15:29

St John ambulance enters the pitch

A St John Ambulance vehicle already at the stadium was brought onto the playing area from the north-east vehicle access and moved towards the West Terrace.

15:18:42

SYMAS is told this is a major incident

A qualified ambulance officer used the radio from the vehicle at Gate C to tell SYMAS Control that the incident was a major incident.

Operation Resolve found that this message was not passed onwards as required.

15:20:47

First SYMAS ambulance reaches the pitch

The first SYMAS ambulance drove onto the playing area.

Approx. 15:23

Senior SYMAS personnel arrive

Deputy Chief Ambulance Officer Alan Hopkins and Assistant Divisional Officer Rodger Morley arrived, followed shortly afterwards by Divisional Superintendent Trevor Dale.

15:28

An ambulance departs Gate C for hospital

CCTV records the first SYMAS ambulance leaving Gate C carrying casualties.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/arrival-ambulances

Section 9.7 · Triage

Casualty Prioritisation Was Not Centrally Organised

Rescue and resuscitation dominated the initial response

The immediate focus of police officers, supporters and medical personnel was understandably on releasing people from the crush and attempting resuscitation.

Operation Resolve found, however, that no effective police-led structure was established to coordinate medical triage.

Informal separation did occur

Superintendent Marshall later described casualties outside Gate C being separated into broad groups: those apparently dead, those seriously injured and those less seriously injured.

This represented local practical decision-making rather than a centrally coordinated stadium-wide triage system.

Medical resources were dispersed

Medical personnel were treating casualties across the pitch, around Gate C, near ambulances and in the gymnasium.

The Police Control Box did not identify a person to oversee triage or establish a coordinated casualty-management structure.

The operational distinction

Rescue is not the same as triage. Removing a casualty from immediate danger is the first task. A mass-casualty system must then rapidly determine priority, allocate scarce clinical resources, organise treatment areas and move the right casualties to definitive care.

Section 9.8 · Fire-service response

Fire-Service Personnel Also Had to Create Their Own Response

They were originally requested for cutting equipment

South Yorkshire County Fire Service personnel attended after a request connected with cutting equipment for the perimeter fencing.

By the time they arrived, the relevant openings had already been created and cutting equipment was no longer the principal requirement.

Fire personnel received little direction

Several fire officers described arriving at Hillsborough and being unable to obtain clear instruction from police personnel about where they were required.

Station Officer Brian Fletcher went to the Police Control Box seeking command information and subsequently decided to establish his own casualty-handling area.

Fire crews switched to medical and casualty support

Fire-service personnel used resuscitation equipment, provided first aid, assisted casualty movement, helped manage ambulance movement and supported aspects of casualty clearing.

Divisional Officer David Lockwood arrived at about 3.24 pm

Lockwood assumed command of the fire-service response but was also unable to identify an effective police site commander directing the multi-agency operation.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/arrival-sycfs

Section 9.9 · Improvised assistance

Supporters and Off-Duty Medical Professionals

Supporters became rescuers

Large numbers of supporters immediately attempted to help others. They pulled people from the pens, carried casualties across the pitch and used advertising hoardings as makeshift stretchers.

The fresh inquests later specifically recognised the efforts made by supporters attempting to rescue those trapped in the crush.

Medical professionals in the crowd volunteered

Doctors, nurses and other medically trained people who were present as spectators offered assistance.

Some attempted resuscitation and treatment. As the scale of fatalities became clearer, medical professionals were increasingly asked to confirm whether casualties had died.

They received little central direction

Operation Resolve found no effective police coordination of these volunteers.

Their contribution was therefore considerable, but much of it occurred through individual initiative rather than planned integration into a casualty-management system.

Section 9.10 · Casualty area

The Gymnasium Became Both Treatment Area and Temporary Mortuary

The location had been identified before the disaster

The gymnasium was a purpose-built sports hall behind the North Stand. It had access from the pitch, road access, some basic facilities and a telephone in an adjoining police room.

It had previously been identified both as a possible casualty location and as a potential temporary mortuary.

From about 3.15 pm it served two incompatible functions

Casualties requiring treatment were brought into the gymnasium while people who had died were also being taken there.

Using the same space simultaneously as a casualty clearing area and mortuary rapidly became difficult to manage.

Preparation was inadequate

Operation Resolve found that there had been little practical planning for how the gymnasium would actually function as a temporary mortuary during a mass-fatality incident.

Medical equipment was limited, major-incident documentation had to be brought from elsewhere, and no detailed layout or process had been established.

Practical problems developed immediately

Treatment areas had to be separated from those who had died. Advertising hoardings used as stretchers accumulated inside. Processes were also required to maintain continuity of identification as bodies were moved.

Greater order was introduced only later when Detective Chief Superintendent Terence Addis took charge of the mortuary arrangements.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-6/initial-situation-gymnasium

Section 9.11 · Definitive care

The Hospitals

Northern General Hospital

The Northern General, approximately 2.4 miles from Hillsborough, received the largest concentration of casualties.

Within the first hour after notification, its Accident and Emergency department received 87 patients — more than it would normally receive in half a day.

Royal Hallamshire Hospital

The Royal Hallamshire, approximately 2.7 miles from the stadium, also received substantial numbers of injured supporters.

Barnsley District General Hospital

A small number of injured people also attended Barnsley District General Hospital.

Hospital major-disaster plans were activated

Each of the receiving hospitals activated its own major-disaster plan before 3.45 pm.

Once casualties reached hospital, structured clinical systems were therefore operating more effectively than the fragmented casualty-management arrangements that had developed at the stadium.

The distribution of casualties also created a major information problem. Families and friends had no reliable central source telling them where individual casualties had been taken, leading many people to travel between hospitals and other reception locations in search of loved ones.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-6/situation-hospitals

Section 9.12 · Inter-agency command

Recurring Communication and Coordination Failures

No visible overall site commander

Operation Resolve identified the absence of a clearly visible senior officer exercising overall command of the emergency response at the scene.

Agencies operated from different pictures

Police, ambulance and fire personnel repeatedly reached the stadium without receiving a complete explanation of what had happened or where they were required.

Medical resources were not centrally allocated

Personnel acted where they encountered casualties rather than being systematically deployed according to casualty priority, treatment requirements and the overall availability of resources.

Senior ambulance liaison came late

At 15:31:38 the Police Control Box asked for the senior ambulance officer at the ground to attend the PCB. By then the ambulance response had already been operating for a significant period.

Terminology became confused

At one point the Police Control Box requested a “Major Incident Bureau”, confusing the distinct functions of a Major Incident Room and a Casualty Bureau.

Local initiative substituted for coordinated command

Police officers, ambulance personnel, fire officers, St John volunteers, medical professionals and supporters repeatedly created local solutions because the integrated command structure was not functioning effectively.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-5/lack-of-police-control

Section 9.13 · Medical evidence and survivability

The 3.15 pm Assumption Was Later Rejected

The original inquests adopted a 3.15 pm evidential cut-off

At the original inquests, the coroner relied upon pathology evidence suggesting that everyone who died had already suffered irreversible fatal injury by 3.15 pm.

Evidence relating to rescue and treatment after that time was consequently excluded from the principal consideration of causation.

The Hillsborough Independent Panel challenged that medical assumption

The Panel's examination of the medical evidence concluded that it could not safely be assumed that life or death had been inevitably determined before 3.15 pm.

It identified the possibility that some people had experienced partial or potentially reversible asphyxia and that what occurred after 3.15 pm could therefore have been medically significant.

The evidence does not permit simple individual claims

The Panel did not conclude that a particular named individual would certainly have survived if a different emergency response had occurred.

Its conclusion was that the earlier assumption that all outcomes were irreversibly fixed before 3.15 pm could no longer be sustained.

This distinction is important and should be preserved. The evidence supports scrutiny of the emergency and medical response after 3.15 pm; it does not justify retrospectively guaranteeing that any particular life would have been saved by one specific intervention.

https://assets.publishing.service.gov.uk/media/5a7c9e4840f0b65b3de0a0ff/0581.pdf

Section 9.14 · Fresh inquest findings

The Emergency Response Was Part of the Causation Findings

Police response after the crush began

The 2016 jury was asked whether any error or omission by the police, after the crush in the West Terrace had begun to develop, caused or contributed to the loss of life.

The jury answered Yes.

Ambulance-service response after the crush began

The jury was separately asked whether any error or omission by the South Yorkshire Metropolitan Ambulance Service caused or contributed to the loss of life.

The jury answered Yes.

The 3.15 pm boundary was not retained

For all but one of those who died, the fresh jury recorded a time-of-death bracket extending beyond the 3.15 pm cut-off that had been used at the original inquests.

https://www.gov.uk/government/speeches/determinations-and-findings-of-the-hillsborough-inquests

Section 9.15 · Operational learning

Lessons for Contemporary Event Emergency Planning

Recognise before mobilising

Responders must first understand what type of incident is occurring. A public-order response and a mass-casualty medical response require fundamentally different priorities.

Declare clearly

Major-incident procedures depend upon an unambiguous trigger understood across every responding organisation.

Establish visible command

Responders arriving at the scene must be able to identify who is coordinating the incident and where the command point is located.

Create a common operating picture

Police, ambulance, fire, medical and venue teams require the same understanding of casualty numbers, access routes, priorities and available resources.

Separate rescue from casualty management

Extraction, triage, treatment and transport are related but distinct functions and require separate coordination.

Control ambulance access

Ambulance routes, loading points and casualty-clearing areas must remain identifiable and usable throughout the response.

Plan the casualty area

Naming a room as a casualty area is insufficient. Layout, equipment, staffing, communications and casualty flow must be considered in advance.

Use spontaneous volunteers intelligently

Assistance from medically qualified spectators and other competent volunteers can be valuable, but it should be incorporated rapidly into the command and triage structure.

Information continues beyond the stadium

Casualty tracking, hospital distribution and family information are part of the emergency response, not separate administrative tasks.

Test the complete system

Plans should be exercised against realistic scenarios involving multiple casualties, restricted access, incomplete information and rapidly changing conditions.

Principal References for Section 9 — 1 to 7

Principal References for Section 9 — 8 to 14

Section 10 · Medical and pathological evidence

Section 10 — The 3.15 pm Issue, Pathology and Survivability

The medical evidence surrounding Hillsborough became one of the most consequential aspects of the disaster's subsequent history. The original pathology evidence helped create the proposition that all those who died had either died or sustained irreversible fatal injury by approximately 3.15 pm.

That proposition affected the scope of the original inquests, examination of the emergency response and, for more than two decades, understanding of whether events after 3.15 pm could have affected survival.

10.1 The original post-mortem examinations

Post-mortem examinations began on the morning of 16 April 1989. Ninety-four examinations were undertaken over approximately two days.

The examinations sought to establish the medical causes of death and formed the foundation of the pathology evidence subsequently presented to the original inquests.

10.2 Asphyxia was central to the medical evidence

The deaths resulted predominantly from the effects of severe crowd compression. Contemporary terminology commonly described the mechanism as traumatic asphyxia.

Later medical analysis has generally used compression asphyxia to describe the mechanism by which external pressure restricted effective breathing and compromised physiological function.

10.3 The physiological process was not identical in every person

Compression did not create one uniform sequence of unconsciousness and death. Pressure, body position, duration of compression, ability to breathe and airway condition varied between casualties.

This variability became crucial when later experts reconsidered whether the assumption of extremely rapid and universally irreversible death was medically justified.

10.4 Removal from the crush did not end the medical risk

A casualty released from crowd pressure could remain profoundly hypoxic, unconscious or vulnerable to airway obstruction and cardiorespiratory arrest.

The condition, airway and positioning of casualties following extraction could therefore remain medically significant.

https://assets.publishing.service.gov.uk/media/5a7c9e4840f0b65b3de0a0ff/0581.pdf

Section 10 · 3.15 pm

How the 3.15 pm Cut-Off Was Created

10.5 A practical evidential boundary became a medical boundary

During preparation for the original inquests, West Midlands Police sought guidance from coroner Dr Stefan Popper concerning the period for which witness evidence should be assembled.

Dr Popper initially indicated that an appropriate point would be around the time when the first person who had died was taken to the temporary mortuary.

10.6 3.15 pm was selected

The cut-off was subsequently fixed at approximately 3.15 pm, close to the time at which the first ambulance entered the pitch.

The ambulance itself was essentially a chronological marker. The substantive reasoning was medical: Dr Popper considered that by this point everyone who died had already died or received injuries from which death was inevitable.

10.7 The consequence extended beyond chronology

Once that proposition was accepted, events after 3.15 pm were treated as incapable of affecting the eventual outcome.

This substantially restricted examination of later rescue, ambulance, triage and medical activity during the original inquests.

The issue was therefore not merely omission of evidence after a particular clock time. The cut-off embedded a medical proposition that the later emergency response could not have affected causation.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-17/3.15pm-cut-off

Section 10 · Medical reassessment

The Hillsborough Independent Panel Revisited the Pathology

10.8 The post-mortem evidence was reconsidered

The Hillsborough Independent Panel reviewed the original medical and pathological material rather than simply accepting the assumptions that had informed the original inquests.

Dr Bill Kirkup played a central role in the Panel's medical reassessment.

28

10.9 Evidence inconsistent with the original rapid-death model

The subsequent Government account of the Panel's findings recorded that 28 people did not have traumatic asphyxia with obstruction of the circulation of the type upon which the original rapid-death proposition had relied.

31

10.10 Continuing heart and lung function

The reassessment identified evidence in 31 cases that heart and lung function continued after the period of crushing.

In 16 cases, there was evidence that this continued for a prolonged period.

41 + 17

10.11 Potential survivability required proper examination

The Panel considered that there was definite evidence in at least 41 cases, and possible evidence in a further 17, that those who died survived for longer than the model relied upon at the original inquests had allowed.

This did not establish that 41 people would certainly have survived. It established that the assumption that their deaths were already inevitably determined could not safely be maintained.

Section 10 · Clinical implications

Why Events After Extraction Could Matter

10.12 Unconscious did not necessarily mean irreversibly dead

A severely hypoxic person may be deeply unconscious while some circulation or respiratory function remains.

Later expert evidence therefore rejected the assumption that profound unconsciousness following extraction was sufficient to establish that survival was already impossible.

10.13 Position could affect an already compromised airway

A casualty whose breathing was already critically impaired remained vulnerable after removal from the crush.

The Panel identified the possibility that placing an unconscious casualty flat on their back could contribute to further airway obstruction.

10.14 Emergency treatment became relevant to causation

Once certainty of irreversible death before 3.15 pm was removed, questions that the original cut-off had largely excluded became relevant.

These included speed of extraction, airway assessment, casualty positioning, oxygenation, CPR, triage, medical supervision, ambulance access and transfer to definitive care.

The pathology issue and emergency-response issue were therefore closely connected.

Section 10.15 · Individual evidence

Kevin Williams

Evidence of possible signs of life became highly significant

Kevin Williams was 15 years old when he died at Hillsborough.

Merseyside Police officer PC Michael Bruder, who was attending as a spectator and joined the rescue effort, attempted resuscitation with a St John Ambulance volunteer.

His original evidence included having felt what he believed was a faint pulse. Photographic evidence and other testimony also recorded attempts to resuscitate Kevin.

The evidence conflicted with the original pathology conclusion

Dr David Slater, who conducted Kevin's post-mortem examination, told the original inquest that Kevin would have become unconscious rapidly and died before being removed from the pens.

That position became difficult to reconcile with witness evidence suggesting possible signs of life after extraction.

The fresh inquests reconsidered the evidence

At the fresh inquests, expert evidence examined whether the observations made by rescuers were medically capable of representing continuing circulation.

The jury ultimately placed Kevin's death within a time range extending beyond the 3.15 pm boundary used at the original proceedings.

Later allegations must be stated accurately

Allegations were made that witnesses had been pressured when their accounts conflicted with the original pathology evidence.

The IOPC subsequently investigated those allegations. The resulting findings require careful distinction between what witnesses alleged and what later investigation was able to establish.

https://www.policeconduct.gov.uk/hillsborough-report/chapter-17/allegations-wmp-pressured-witnesses

Section 10 · Legal consequence

The Medical Evidence Helped Reopen the Inquests

10.16 The Attorney General acted after the Panel report

Following publication of the Hillsborough Independent Panel report in September 2012, Attorney General Dominic Grieve KC examined whether the original inquest findings should be quashed.

The new medical evidence formed an important part of the case supporting fresh proceedings.

10.17 The High Court heard the application in December 2012

On 19 December 2012, the High Court delivered judgment in Attorney General v Coroner of South Yorkshire (West) & Anor [2012] EWHC 3783 (Admin).

The previous inquest findings were quashed and fresh inquests ordered.

10.18 The 3.15 pm issue was central

The court recognised that the earlier proceedings had not adequately examined whether some people might have survived with quicker rescue and treatment or whether deficiencies in the emergency response contributed to individual deaths.

The medical reassessment therefore changed not merely a technical pathology issue but the permissible scope of the legal investigation.

Once evidence raised a realistic possibility that the substantial truth concerning the deaths had not emerged at the original inquests, fresh investigation became necessary.

https://www.bailii.org/ew/cases/EWHC/Admin/2012/3783.html

Section 10 · Fresh medical examination

The Fresh Inquests Reconsidered Each Death

10.19 The old temporal boundary was removed

The fresh inquests heard extensive evidence concerning what happened after 3.15 pm, including rescue, resuscitation, treatment, casualty movement and ambulance response.

Individual medical histories could therefore be examined using witness accounts, photographs, video, pathology and clinical evidence.

Medical experts examined survivability individually

Clinical and forensic pathology experts considered the available evidence for individual casualties rather than treating every death as the result of one identical physiological sequence.

10.20 Time of death was considered through ranges

The fresh proceedings did not impose one universal 3.15 pm time boundary upon every death.

Individual evidence was considered when assessing possible time-of-death ranges.

The emergency response was formally relevant

The jury concluded that errors or omissions by both the police and South Yorkshire Metropolitan Ambulance Service after the crush had begun caused or contributed to loss of life.

https://www.gov.uk/government/speeches/determinations-and-findings-of-the-hillsborough-inquests

Section 10.21 · Academic medical evidence

Compression Asphyxia and the Later Medical Literature

Nolan et al. — Emergency Medicine Journal

Jerry P Nolan, Jasmeet Soar, Nathaniel Cary, Nigel Cooper, Jack Crane, Ashley Fegan-Earl, William Lawler, Philip Lumb and Guy Rutty, Compression asphyxia and other clinicopathological findings from the Hillsborough Stadium disaster.

The paper draws upon the work of clinicians and forensic pathologists involved in the later Hillsborough proceedings.

It concluded that the cause of death in nearly all cases examined was compression asphyxia and provides a modern clinical discussion of the way severe crowd compression affects breathing and circulation.

For crowd-safety practitioners, its importance lies in connecting physical crowd conditions with clinical consequence. Severe sustained pressure is not merely uncomfortable or restrictive: it can prevent adequate respiration and rapidly become life-threatening.

https://doi.org/10.1136/emermed-2020-209627 https://pubmed.ncbi.nlm.nih.gov/32883753/

Section 10.22 · Long-term medical consequence

Anthony Bland

Catastrophic hypoxic brain injury

Anthony Bland suffered severe chest compression at Hillsborough. His breathing stopped and deprivation of oxygen caused catastrophic and irreversible damage to the cerebral cortex.

Although his brain stem continued to function, he remained in a persistent vegetative state and had no prospect of recovering consciousness.

A landmark medical-law case

After several years of treatment, Airedale NHS Trust sought legal authority to discontinue artificial nutrition and hydration.

The case reached the House of Lords as Airedale NHS Trust v Bland [1993] UKHL 17.

The House of Lords held that withdrawal of the life-sustaining treatment in those circumstances was lawful.

The 96th Hillsborough fatality

Anthony died in March 1993.

His case demonstrates that the medical consequences of Hillsborough did not end on 15 April 1989 and ultimately influenced the development of English medical law.

https://www.bailii.org/uk/cases/UKHL/1993/17.html

Section 10.23 · Long-term consequence

Andrew Devine

Andrew Devine was 22 years old at the time of the disaster and sustained severe, life-changing injuries at Hillsborough.

He survived for more than 32 years with the consequences of those injuries.

Andrew died on 27 July 2021, aged 55.

The subsequent inquest

The coroner determined that Andrew's death resulted directly from the injuries he had sustained at Hillsborough.

The coroner also concluded that Andrew had been unlawfully killed.

He thereby became recognised as the 97th person to die as a result of the Hillsborough disaster.

Why his case matters to this section

Andrew's experience demonstrates that the medical consequences of catastrophic crowd compression may extend across decades and that legal recognition of a death as resulting from a disaster may occur many years after the original incident.

https://www.policeconduct.gov.uk/our-work/investigations/hillsborough/about-investigations

Section 10.24–10.25 · Forensic pathology legacy

The 2024 Independent Review of Forensic Pathology

The Home Office established a further independent review following the recommendation that the failures in pathology exposed through Hillsborough should be examined for their wider professional implications.

10.24 It was not another reinvestigation of Hillsborough

The review was not intended to reinvestigate the disaster or independently determine the survivability of individual Hillsborough victims.

The fresh inquests remained the authoritative proceedings addressing those individual questions.

Families must understand what pathology has found

The review identified clear and empathetic communication with bereaved families as an essential component of good forensic practice following mass-fatality incidents.

Survivability should be anticipated from the beginning

Questions concerning potential survivability are foreseeable following mass-fatality incidents.

Post-mortem examination should therefore preserve information that may later be required by appropriately qualified clinicians assessing survivability.

10.25 A multidisciplinary approach is required

The review recommended moving beyond reliance upon individual on-call forensic pathologists towards a planned team approach involving relevant specialist expertise.

This may include expertise in intensive care and pre-hospital emergency medicine when survivability questions are likely to arise.

https://www.gov.uk/government/publications/independent-review-of-forensic-pathology https://www.gov.uk/government/publications/independent-review-of-forensic-pathology/independent-review-of-forensic-pathology-accessible

Section 10.26 · Operational learning

Medical Learning for Crowd and Event Safety

Do not assume immobility means death

An unconscious and unresponsive casualty requires competent clinical assessment. Appearance alone cannot establish irreversibility.

Release from pressure is only the first stage

Extraction must be followed by rapid assessment of airway, breathing and circulation and appropriate treatment.

Casualty position matters

A person whose respiratory function is critically compromised may remain vulnerable to airway obstruction after release from compression.

Triage must begin rapidly

Mass-casualty incidents require structured prioritisation rather than uncontrolled concentration of treatment around whichever casualties responders encounter first.

Preserve evidence as well as life

Accurate recording of casualty location, condition, treatment, movement and timing can become important both clinically and during subsequent investigation.

Avoid arbitrary temporal assumptions

A convenient clock time should not substitute for individual clinical evidence where causation or survivability remains uncertain.

Pathology must anticipate survivability questions

Mass-fatality post-mortem examinations should preserve sufficient evidence for subsequent multidisciplinary assessment of both cause of death and potential survivability.

Families are part of the process

Bereaved families require clear and humane explanations concerning examinations, findings and areas of continuing uncertainty.

Section 10 · Conclusion

Section 10 Conclusion

The 3.15 pm issue demonstrates how a medical assumption can shape the subsequent understanding of an entire disaster.

At the original Hillsborough inquests, pathology evidence supported the proposition that everyone who died had either died or suffered irreversible fatal injury before 3.15 pm. Once that proposition was accepted, much of the subsequent rescue and medical response was treated as incapable of affecting causation.

The Hillsborough Independent Panel fundamentally changed that understanding. Examination of the original medical material showed that the physiological experiences of those who died were not uniform and that evidence existed of continuing heart, lung or circulatory function beyond the period assumed by the original model.

The important conclusion is not that a particular number of people would certainly have survived. Medicine cannot retrospectively provide that certainty. The important conclusion is that survival had not been shown to be impossible and that the response following extraction therefore required proper investigation.

That distinction contributed to the High Court decision to quash the original inquests. The fresh proceedings subsequently examined the deaths in considerably greater detail and found that errors or omissions in both the police and ambulance response caused or contributed to loss of life.

The later experiences of Anthony Bland and Andrew Devine also demonstrate that the medical consequences of Hillsborough extended far beyond the afternoon of 15 April 1989.

The 2024 Independent Review of Forensic Pathology carries that learning forward. Forensic investigation following a mass-fatality incident must preserve information required to understand survivability, involve appropriate medical expertise and communicate with bereaved families clearly and respectfully.

For crowd-safety professionals, the operational principle is equally important: once people have been released from dangerous crowd pressure, the emergency is not necessarily over. Rapid assessment, effective triage, appropriate positioning, resuscitation, treatment and transport remain integral parts of the crowd-safety system.

Principal References for Section 10 — 1 to 8

Principal References for Section 10 — 9 to 16

Reference 9 — Nolan et al.: Compression Asphyxia and Other Clinicopathological Findings

Peer-reviewed clinical analysis by medical and forensic experts involved in the later Hillsborough proceedings.

https://doi.org/10.1136/emermed-2020-209627

Translate »